NCHRP 09-63 Project Update: A Calibrated and Validated National Performance-Related Specification for Emulsified Asphalt Binder Greg Harder AASHTO TSP•2.

Similar presentations


Presentation on theme: "NCHRP 09-63 Project Update: A Calibrated and Validated National Performance-Related Specification for Emulsified Asphalt Binder Greg Harder AASHTO TSP•2."— Presentation transcript:

1 NCHRP Project Update: A Calibrated and Validated National Performance-Related Specification for Emulsified Asphalt Binder Greg Harder AASHTO TSP•2 – Emulsion Task Force (ETF) Meeting Heritage Research Group – The Center Indianapolis, IN June 12-13, 2019

2 Project Objectives Develop a national performance-related material specification for emulsified asphalt binder for use with chip seals and microsurfacing/slurry seals that: is similar in concept and format to AASHTO Standard Specifications M320 and M332; is calibrated and validated with performance data from field test sections; uses readily available testing equipment (i.e., Superpave test equipment); and reflects varying climatic and traffic conditions.

3 ETF Draft Specification will be used as the starting point
Project Objectives Develop a national performance-related material specification for emulsified asphalt binder for use with chip seals and microsurfacing/slurry seals that: is similar in concept and format to AASHTO Standard Specifications M320 and M332; is calibrated and validated with performance data from field test sections; uses readily available testing equipment (i.e., Superpave test equipment); and reflects varying climatic and traffic conditions. ETF Draft Specification will be used as the starting point

4 ETF Draft Specification

5 ETF Draft Specification

6 NCHRP Research Team

7 NCHRP 09-63 Activities Project started May 1, 2019
Expected completion by May 1, 2023 Phase 1 Approximately 6 months Phase 2 Subject to approval by Project Panel Remaining 42 months

8 NCHRP 09-63 Activities Phase 1 Deliverables Conduct Literature Review
Propose Preliminary Specification Provide Detailed Experimental Plan for Phase 2 Provide Interim Report

9 NCHRP 09-63 Activities Phase 2 Conduct Experimental Plan
Propose Final Specification Communicate Findings through Presentations Provide Final Report

10 2019 Timeline

11 NCHRP 09-63 Activities Project Status Literature Review underway
Amplified Work Plan submitted Reviewing ETF Testing Program data Kick-off conference call meeting with Panel scheduled

12 NCHRP 09-63 Questions or Comments?
Reach out to any of the research team members! Mike Anderson office cell

13 Thanks!