Download presentation
Presentation is loading. Please wait.
1
Pair Production Analysis
All P/P runs were at nearly the same beam energy MeV MeV There should be narrow band of collected data around ID & ID That’s horizontally across the middle of HYCAL
2
Photon Energy for Pair Production seems
5448 zoomed Photon Energy for Pair Production seems very consistent for each Production Run
3
5328 Trigger 10 is the MOR-HYCAL Coincidence
4
This peak occurs at around ID900 to ID950
5328 This peak occurs at around ID900 to ID950 That would correspond to G900+ That would put this spike in the bottom right of HYCAL? There may be labeling error It should be ~G & ~W
5
Current Direction I am going to be combining analysis codes for:
Tagger Pair Spectrometer Veto HYCAL In order to make cuts on pair production events using HYCAL and PS data
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.