Download presentation
Presentation is loading. Please wait.
1
ASTRON EMBRACE Project status G.W. Kant
2
EMBRACE concept ‘analogue’ tiles
RF transport to central processing facility antenna elements
3
Tile Baseline architecture
4
EMBRACE Embrace is a development/production project, given the size and the time frame Use currently available technology If possible enhance EMBRACE with DSX outputs
5
Work Breakdown Structure
6
EMBRACE DS5 Tasks
7
EMBRACE DS5 Tasks
8
EMBRACE DS5 Tasks
9
EMBRACE DS5 Tasks Original estimates DS5 – Coordination (48mm/4fte)
DS5 – T1 Design and development of (382mm/32fte) DS5 – T2 Production of EMBRACE (244mm/20fte) DS5 – T3 Test the EMBRACE systems (190mm/16fte)
10
EMBRACE DS5 Tasks Astron UK OPAR CSIRO U-CAM OMMIC / IRA Jive / MPIfR
NRF (S.A) Jive / MPIfR Totals DS5 48 DS5-T1 240 32 10 12 18/0 16 308 (382) DS5-T2 84 12/0 160 (244) DS5-T3 44 0/12 32/12 184 (190)
11
EMBRACE DS5 Deliverables
Discuss/define DS5 – T3 deliverables first at SKADS level T3 deliverables are now detailed to a sufficient level to proceed T3 deliverables have to be enhanced further (parallel to T1/T2 activities)