Download presentation
Presentation is loading. Please wait.
Published byJustine Lavy Modified over 10 years ago
1
ABRUZZO, 2009 AN EARTHQUAKE DESTROYS THE CITY OF LAQUILA, ITALY During the G8 meeting the Great of the world discuss the necessity for new building technology that protect people from the fury of nature. CATASTROPHIC EVENTS
2
HURRICANES - DESTROYED HOMES AND MILLIONS OF PEOPLE MADE HOMELESS Almost all the wooden houses were lost.
3
SOLUTIONS IN CONCRETE NEW ZEALAND INDIA EUROPE MIDDLE EAST AMERICA AFRICA
4
EARTHQUAKE-PROOF SOLUTIONS IN CONCRETE FROM FORMWORK1
5
Formwork1 Systems TUB column formwork: - Very light - Reusable about 100 times - Easy and intuitive to use - Few parts and common to all systems – a single handle works with all of them
6
PANEL wall formwork Standard panel size: 47.2 x 23.6weight 24.2 lb Compensation panels: 15.7 x 23.6 weight 8 lb 11.8 x 23.6 weight 6.4 lb 9.8 x 23.6 weight 5 lb 7.9 x 23.6 weight 4.9 lb Wall thickness 3.9 to 17.7 Formwork1 Systems
7
SKYRAIL - One-way ribbed slab Formwork1 Systems
8
reusable at least 100 times on centres between ribbing: 23.6 height of ribs: 6.3, 7.9 or 9.4 the investment is amortised in few pours 1.6 / 1.9 7.9 6.5 23.6 3.5 Formwork1 Systems SKYRAIL - One-way ribbed slabs SPACER T-BEAM
9
SKYDOME - Two-way slabs for large span Formwork1 Systems
10
SKYDOME - Two-way slabs for large spans reusable form height: 7.9, 9.8, 11.8, 13.8 or 15.7 rib width: 4.7, 6.3 or 7.9 slab thickness: 9.8 min – 18.9 max 33.9 6.327.5 4.7 32.3 35.4 7.9 Formwork1 Systems CUBE BEAM
11
Product: Skydome Slab surface: 141 sqyd Structure: waffle slab Location: Italy Formwork1 Systems
12
Product: Skydome Slab surface: 118 m 2 Structure: waffle slab Location: Italy Formwork1 Systems
13
Product: Geotub and Geotub Panel Project: new hospital Structure: concrete columns Location: UK
14
Formwork1 Systems Product: Geotub and Geotub Panel Project: office block Structure: concrete columns Location: UK
15
The M50 motorway consists of two-lane dual carriageway, though auxiliary/weaving lanes are provided at several junctions. Plans are in progress under the National Development Plan to upgrade several of the roundabout junctions, including the Red Cow, to free-flowing grade-separated interchanges. The upgrade project also includes widening the surrounding motorway to three or four lanes each direction from the M1 to Sandyford with the extra driving lanes replacing the existing wide grass-covered median. This is a major project that is bringing a certain degree of disruption to the trafic flow on the M50: as the road is extremely important for the daily commuting of the Irish capital, it is important that the level of disruption is kept minimal. The new bridges are each carried by 12 round columns of dia 23.6 in. Geotub 60 column formwork was chosen as it avoided the use of cranes, which would have forced the temporary closure of traffic lanes during installation and / or operation. Dublin, Ireland M50 motorway extension, Red Cow Roundabout Formwork1 Systems
16
Product: Geotub Project: M50 motorway bridge Structure: concrete columns Location: Ireland
17
Product: Geotub Project: M7 motorway bridge Structure: concrete columns Location: Ireland Formwork1 Systems
18
Product: Geotub Project: University Campus Structure: concrete columns Location: Padova, Italy Formwork1 Systems
19
Product: Geopanel Project: commercial building Structure: blade columns Location: Saudi Arabia Formwork1 Systems
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.