CEM 515 Done by: Abdulkarim Sulais

Similar presentations


Presentation on theme: "CEM 515 Done by: Abdulkarim Sulais"— Presentation transcript:

1 CEM 515 Done by: Abdulkarim Sulais
King Fahd University of Petroleum and Minerals College of Environmental Design Construction Engineering & Management Department Procurement Process In Construction Industrial Project CEM 515 Done by: Abdulkarim Sulais

2 Outline Definition Objective Procurement process Performance indictor
Improvement Benefits Conclusion

3 Procurement Process Definition
It is the process required to supply equipment , material , service and other resources needed to carry out a project that satisfy customer

4 Industrial Project Cost Distribution
Item Description Weight 1 Engineering 5% 2 Equipment / Material 65% 3 Construction 15% 4 Testing and Commissioning 10%

5 Objective 1-Setting procurement process required to supply equipment , materials and other resources to carry out in constructing industrial project right the first time and every time. 2- Monitoring performance indictor to help manager to prevent and reduce problem that can affect the procurement process.

6 Procurement Process : Planning Documentation Product Evaluation
Awarded Administration Inspection Delivery

7 Begin Planning Documentation Product Evaluation Awarded Inspection Delivery

8 1- Procurement planning
Input Scope of work Specification and drawings Company resource Signature mandate Product estimated value

9 1- Procurement planning
Output Product list Product supplier list Type of procurement contract Sole source Single source Competitive bids Estimated product value Approval to proceed with procurement

10 2-Documentation Tender documents Standardized forms Inquiry
Invitation letter Purchase order General terms and condition Filing system

11 3-Product Evaluation Price Delivery time
Financial capability of supplier Type of product Historical of supplier Supplier approaches Workload existing and anticipated Customer feedback Reference Approval

12 4-Contrcat Award Notify successful tender and unsuccessfully tender of outcome Compile contract documents Formally accepted tender offer

13 5-Contract Administration
Monitor supplier progress Inspection Shipment and delivery Payment Check compliance with quality

14 Performance indicators of PP
Cycle times The different activities within PP Milestone events Issuing R.Q - PO Approval of drawings Inspection Customs clearance Delivery Management Project police Project Organization

15 Performance indicators for PP
4. Cost Indicator No of days in warehouse No of days in customs No of days correction / repair No of changes to air transportation Time from arrival till installation 5. Referential values Amount of PO No and amount of change orders Delivery / invoicing

16 1- Cause – Effect for long cycle times

17 Materials Non conformity Report
Shortage of materials Out of specification Incomplete delivery Excess of materials Damage and defective

18 Materials Non conformity Report

19 Evaluation of the Procurement Process
Whether the procurement satisfied the stated objective Whether needs and expectation have be meets Whether the procurement process should be improve How external factors such regulation , standard component have change Whether the process improve cost saving

20 Evaluate of procurement process
Review of performance indicator Review pf non conformity report Effect analysis regarding delays Costs and time cycles

21 Evaluation and Improvement (QFD)

22 Benefits of Procurement process Quality management
Improve company and project reputation name Achieving customer satisfaction and increase market share Reduce rework and mistake Standardized forms Reduce warranty period Increase profit Lower insurance cost Improve cash follow

23 Finding and Conclusion
The problem present on procurement are of different types and origins. The most detected problem : Planning Delay on issuing specification for quotation Delay on informing supplier Supplier To many obstacles and clauses delay negotiations Poor explanation about items Later purchase makes system expensive , air freight and urgent

24 Finding and Conclusion
Delay at delivery Delay on ordering Delay on engineering drawings ( errors) Repair and replacement at job site Poorly planned inspection Lack of information on site about arrival for some supplier Changes to air transportation to make faster delivery Using PP indicator and periodical report is tools to monitor and prevent delays Using IT ( , scheduling etc ) will help in reducing delay and closely monitor the product progress for necessary action .