Presentation is loading. Please wait.

Presentation is loading. Please wait.

WG11 Snapshot January ‘10 Date: Authors: Name Company

Similar presentations


Presentation on theme: "WG11 Snapshot January ‘10 Date: Authors: Name Company"— Presentation transcript:

1 WG11 Snapshot January ‘10 Date: 2010-01-12 Authors: Name Company
doc.: IEEE /1303r0 January 2010 WG11 Snapshot January ‘10 Date: Authors: Name Company Address Phone Bruce Kraemer Marvell 5488 Marvell Ln Santa Clara, CA 95054 +1 - 321 4 27 4098 marvell .com Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

2 January 2010 WG11 Task Group TGp PAR expires Dec 31, TGu PAR expires Dec 31, 2010 TGs PAR expires Dec 31, 2010 Bruce Kraemer (Marvell)

3 WG11 Task & Study Group Officers
January 2010 WG11 Task & Study Group Officers Cat Group Chair Vice Chair Technical Editor Secretary WG WG11 Bruce Kraemer Jon Rosdahl Adrian Stephens Terry Cole Stephen McCann TG Mb Matthew Gast Michael Montemurro P Lee Armstrong none Wayne Fisher Susan Dickey S Dee Denteener Kazuyuki Sakoda Stephen Rayment U Necati Canpolat Dave Stephenson V Dorothy Stanley Emily Qi -OPEN- Z Menzo Wentink Daniel Borges AA Ganesh Venkatesan Alex Ashley Hang Liu AC Osama Aboul-Magd Menzo Wentink, Joonsuk Kim -NYRQ- AD Eldad Perahia Vinko Erceg, John Barr SC WNG Clint Chaplin ARC David Bagby SG TVWS Richard Kennedy QoS MAN AH JTC1 Andrew Myles REG Bruce Kraemer (Marvell) NYRQ = Not yet required, nominations are not open OPEN = Candidate Nominations are open

4 January 2010- WG11 Task & Study Group Officers
Cat Group Chair Vice Chair Technical Editor Secretary WG WG11 Bruce Kraemer Jon Rosdahl Adrian Stephens Terry Cole Peter Ecclesine Stephen McCann TG Mb Matthew Gast Michael Montemurro P Lee Armstrong none Wayne Fisher Susan Dickey S Dee Denteener Kazuyuki Sakoda Stephen Rayment U Necati Canpolat Dave Stephenson V Dorothy Stanley Emily Qi Z Menzo Wentink Daniel Borges AA Ganesh Venkatesan Alex Ashley Hang Liu -OPEN- AC Osama Aboul-Magd Menzo Wentink, Joonsuk Kim -NYRQ- AD Eldad Perahia Vinko Erceg, John Barr SC WNG Clint Chaplin ARC David Bagby SG TVWS Richard Kennedy QoS MAN AH JTC1 Andrew Myles REG Bruce Kraemer (Marvell) NYRQ = Not yet required, nominations are not open OPEN = Candidate Nominations are open

5 IEEE 802.11 Standards Pipeline
January 2010 doc.: IEEE /1303r0 January 2010 IEEE Standards Pipeline 802.11W Management Frame Security 802.11mb Maintenance k+r+y 802.11u WIEN MAC 802.11aa Video Transport e QoS 802.11s Mesh 802.11p WAVE 802.11r Fast Roam h DFS & TPC Security 802.11k RRM 802.11V Network Management i Security 802.11Y Contention Based Protocol f Inter AP 802.11z TDLS QoS Mgmt Frm 802.11ae Low Power Smart Grid 802.11n High Throughput (>100 Mbps) a 54 Mbps 5GHz 802.11ac VHT 5GHz g 54 Mbps 2.4GHz 802.11ad VHT 60GHz PHY TVWS 802.11af 802.11b (’99) 11 Mbps 2.4GHz Published Amendment Discussion Topics Study groups TG without draft TG Letter Ballot Sponsor Ballot Published Standard Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

6 WG11 Editor Abstract / Agenda – Jan 2010
September 2009 July 2007 January 2010 doc.: IEEE /0990r1 doc.: IEEE /1303r0 November 2009 January 2010 WG11 Editor Abstract / Agenda – Jan 2010 Roll Call / Contacts / Reflector Go round table and get brief status report Review action items from previous meeting Numbering Alignment process Amendment Ordering / ANA Status / Draft Snapshots RevCom preparation process discussion Conference Calls Slide 6 Slide 6 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 6 Page 6 Terry Cole (AMD) Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

7 WNG SC – January 2010 Review of objectives
May 2008 January 2010 doc.: IEEE /1303r0 January 2010 WNG SC – January 2010 Review of objectives Adding 900 MHz ISM band into ( wng-900-mhz-ism-band.ppt) – Dave Halasz IEEE for High Speed Mobility ( wng-ieee for-high-speed-mobility.ppt) - Hiroshi Mano An Example Protocol for FastAKM ( wng) - Hiroki Nakano Review Objectives for March 2010 Meeting Bruce Kraemer (Marvell) Page 7 Bruce Kraemer (Marvell)

8 January 2010 May 2008 doc.: IEEE /1303r0 doc.: IEEE /0547r0 Nov 2009 January 2010 IEEE ARC SC – Jan 2010 ARC activities occur on a “demand driven basis” No ARC SC activity during Nov 2009 and Jan 2010 sessions Expected activities 802.1 Architecture 802.1 will be working on revising the .1 architecture document during the March 2010 Plenary. Arc SC is the .11 interface to .1, therefore Arc sessions are expected for March plenary to provide .11 input/interface to .1 Possible ARC SC conf calls before March depending on .1 schedule Emergency services ARC SC will be discussing ES interactions/impacts in .11 during March sessions. Slide 8 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 8 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

9 TGmb January 2010 Summary LB 160 results
doc.: IEEE /1303r0 January 2010 TGmb January 2010 Summary LB 160 results Approval is now 89% (up from 87%) 246 comments received – see CIDs in 11-09/0706r7 Draft 2.01 in the members area includes 11n During LB 160, the TGmb editorial team rolled n-2009 into the working draft Editorial review of D2.01 follows this meeting Comment resolutions will be applied to D2.02 4 ad hoc groups processing technical comments Editorial plus 3 technical groups: General, Security, and MAC TGmb is hoping for an insect-free meeting Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

10 TGp Snapshot for January 2010
Month Year doc.: IEEE /1303r0 doc.: IEEE yy/xxxxr0 January 2010 January 2010 TGp Snapshot for January 2010 Sponsor Ballot #0 passed, 93.4 % affirmative 156 comments (100 technical) Began comment resolution with teleconferences 9 time slots this week Expect to complete all comment resolutions during this week Slide 10 Lee Armstrong (Armstrong Consulting, Inc.) Bruce Kraemer (Marvell) Page 10 John Doe, Some Company Bruce Kraemer (Marvell)

11 TGs Mesh Networking – January 2010
November 2009 January 2010 September 2009 doc.: IEEE xxx doc.: IEEE /0547r0 doc.: IEEE /1303r0 January 2010 January 2010 TGs Mesh Networking – January 2010 TGs Draft 4.0 passed LB#159 (closing just before Jan LA meeting) with 85% approval and 809 comments. The official announcement counted 1046 comments, but there were 237 duplicates The current comment resolution spread sheet is 11-10/32r1. See table below for comments overview. TGs draft agenda is in submission 11-10/0036r1. The focus is on comment resolution Candidates for position of temporary Secretary, and/or vice Chair welcomed Elections on thursday editorial technical Comments from LB 159 360 45% 449 55% Slide 11 Slide 11 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 11 Page 11 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

12 IEEE 802.11u – January 2010 Review of Teleconferences
doc.: IEEE /1303r0 January 2010 IEEE u – January 2010 Review of Teleconferences Continued Sponsor Ballot Comment Resolution u-D8-0-comments-spreadsheet.xls Liaisons External Expert Review Agenda in document r0 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

13 IEEE 802.11v – January 2010 Initial Sponsor Ballot Results This week
doc.: IEEE /1303r0 January 2010 IEEE v – January 2010 Initial Sponsor Ballot Results 161 in ballot pool, 105/26/6 Y/N/A : 80.8% approve, 19.2% disapprove 327 comments received, 180 Technical, 123 Editorial, 24 General Comments in This week Initial Sponsor Ballot Comment Resolution Recirculation Sponsor Ballot Agenda in document Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

14 January 2010 IEEE z – Jan 2010 Los Angeles The initial 11z Sponsor Ballot passed with 87% approval rate 103 y, 15 n, 7 a 218 comments received TGz has 5 timeslots this week to finalize comment resolution Recirc SB expected after LA meeting Bruce Kraemer (Marvell)

15 IEEE 802.11aa – Los Angeles, California
January 2010 May 2008 doc.: IEEE /1303r0 doc.: IEEE /xxxxr0 Jan 2010 January 2010 IEEE aa – Los Angeles, California Goals for the Los Angeles Session: Listen to technical proposals relevant to aa topics Complete review of interworking with 802.1Qat proposal Complete review of Intra-AC prioritization proposal Discuss and resolve review comments on Draft 0.03. Stage normative/informative text corresponding to all .11aa PAR topics for inclusion into the draft v0.99 Plan for the Joint meeting with 802.1AVB in March Opening Report in doc 10/0053r0 Slide 15 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 15 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

16 January 2010 May 2008 doc.: IEEE /1303r0 doc.: IEEE /xxxxr0 November 2009 January 2010 IEEE ac – November 2009 Continue the work on the TG documents to close any open issues. 09-059r4 is the baseline document for the Selection Procedure. r2 is the baseline document for the Usage Models. r8 is the baseline document for the Channel Models Addendum. r6 is the baseline document for Functional Requirements and Evaluation Methodology. r2 is the baseline document for Specification Framework Discussion with TGaa on TGac related OBSS issues Call for ad hoc chairs nomination and selection Technical contributions Agenda in document r0 Slide 16 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell) Page 16 Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

17 TGad – Meeting Goals – January 2010
doc.: IEEE /1303r0 January 2010 TGad – Meeting Goals – January 2010 Continue working on task group documents Channel Model Evaluation Methodology Selection Procedure Planning for proposal presentations in March and May Technical contributions Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

18 TGae January 2010 Summary QoSMAN PAR has been approved.
Month Year doc.: IEEE /1303r0 doc.: IEEE yy/xxxxr0 Month Year January 2010 TGae January 2010 Summary QoSMAN PAR has been approved. Begin working as a the TGae Task Group Elect Task Group officers Goal is to create and approve TGae Requirements and Use Cases document. Revise plan of record. Slide 18 Bruce Kraemer (Marvell) John Doe, Some Company Page 18 John Doe, Some Company Bruce Kraemer (Marvell)

19 TGaf – Meeting Goals January 2010
Select TG officers Chair, Vice-Chair and Secretary [Technical Editor when required] Review regulatory landscape, TVWS database proposals Set expectations for Purpose, Principles and Vision/Outcome for the project Meet with and to discuss our plans Plan for March Plenary in Orlando Slide 19 Slide 19 Bruce Kraemer (Marvell)

20 IEEE JTC1 ad hoc – Jan 20109 Review goals of JTC1 ad hoc
January 2010 doc.: IEEE /1303r0 January 2010 IEEE JTC1 ad hoc – Jan 20109 Review goals of JTC1 ad hoc Review status of WAPI in ISO/IEC Consider next steps by IEEE 802 in relation to WAPI Consider inviting an expert to present WAPI to the IEEE meeting in Beijing in May 2010 Consider liaising all IEEE Sponsor Ballot drafts to ISO/IEC JTC1/SC6 as matter of course Start technical review of WAPI Discuss any other JTC1/SC6 liaison matters Bruce Kraemer (Marvell) Bruce Kraemer (Marvell)

21 Regulatory Ad Hoc Committee Meeting Goals January 2010
The regulatory summaries Regulatory issues status EN revision update FCC 5 GHz rules changes update TVWS database proposals SE43 cognitive radio in the white spaces Critical issues actions Response to the FCC TVWS database proposals Response to the Ofcom consultation: Geolocation for Cognitive Access Slide 21 Bruce Kraemer (Marvell)

22 January 2010 Recent Ballots Bruce Kraemer (Marvell)

23 January 2010 LB 159 – TGs – Jan 2010 WG Letter Ballot #159 which was a 20 day Working Group technical recirculation Ballot asking the question "Should P802.11s D4.0 be forwarded to Sponsor Ballot?". Ballot Opening Date:    Friday Dec xx, 2009 - 23:59 ET Ballot Closing Date:   Friday Jan 08, 2010 - 23:59 ET  248 eligible people are in this ballot group.     150 affirmative votes    negative votes     33 abstention votes ===   210 votes received  = % valid returns                                      =  15.71% valid abstentions   APPROVAL RATE: 150  affirmative votes       =   % affirmative   27  total negative votes  =     % negative The 75% affirmation requirement was met, Motion passes. There were 1046 comments received. Bruce Kraemer (Marvell)

24 January 2010 LB 160 – TGmb – Jan 2010 WG Letter Ballot #160 which was a 28 day Working Group technical recirculation Ballot asking the question "Should P802.11mb D2.0 be forwarded to Sponsor Ballot?". Ballot Opening Date:    Friday Dec 11, 2009 - 23:59 ET Ballot Closing Date:   Friday Jan 08, 2010 - 23:59 ET  RESPONSE RATE: 246 eligible people are in this ballot group.     166 affirmative votes    negative votes     25 abstention votes ===   211 votes received  = % valid returns                                      =  11.85% valid abstentions   APPROVAL RATE: 166  affirmative votes       =   % affirmative   20  total negative votes  =     % negative The 75% affirmation requirement was met, Motion passes. There were 246 comments received. Bruce Kraemer (Marvell)

25 TGp Sponsor Ballot #0 January 2010
The initial IEEE P802.11p (Wireless Access in Vehicular Environments) 30 day Sponsor Ballot asked the question “Should  P802.11p  Draft 9.0 be forwarded to RevCom?” The official results for this Sponsor Ballot  follow: Ballot Opening Date:   Friday  October 23, 2009 - 23:59 ET Ballot Closing Date:     Sunday        November 22, 2009 - 23:59 ET  164 eligible people are in this ballot group.     114 affirmative votes 8 negative votes with comments 0 negative votes without comments 14 abstention votes ======= 136  votes received  =  82.9 % valid returns                              =  10.3% valid abstentions   APPROVAL RATE: 114  affirmative votes       =      93.4 % affirmative    8  total negative votes  =      % negative Motion passed There were 156 comments received Bruce Kraemer (Marvell)


Download ppt "WG11 Snapshot January ‘10 Date: Authors: Name Company"

Similar presentations


Ads by Google