Download presentation
Presentation is loading. Please wait.
1
IEEE 1900.7 White Space Radio Status Report
November 2005 doc.: IEEE /1051r0 04/08/2019 IEEE White Space Radio Status Report Date: ; Beijing Authors: Notice: This document has been prepared to assist IEEE DYSPAN SC. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE DYSPAN SC. Patent Policy and Procedures: The contributor is familiar with the IEEE Patent Policy and Procedures < ieee802.org/guides/bylaws/sb-bylaws.pdf>, including the statement "IEEE standards may include the known use of patent(s), including patent applications, provided the IEEE receives assurance from the patent holder or applicant with respect to patents essential for compliance with both mandatory and optional portions of the standard." Early disclosure to the Working Group of patent information that might be relevant to the standard is essential to reduce the possibility for delays in the development process and increase the likelihood that the draft publication will be approved for publication. Please notify the Chair as early as possible, in written or electronic form, if patented technology (or technology under patent application) might be incorporated into a draft standard being developed within IEEE DYSPAN SC. If you have questions, contact the IEEE Patent Committee Administrator at Slide 1 Mujtaba (Agere), Petranovich (Conexant), Fischer (Broadcom), Stephens (Intel) et. al.
2
Outline IEEE DySPAN-SC Project title and scope Current status
04/08/2019 Outline IEEE DySPAN-SC Project title and scope Current status Current results Use cases General requirements WG decisions Beijing meeting results Draft development schedule Contribution schedule WG constitution Participation tools Slide 2
3
IEEE DySPAN-SC Scope of the DySPAN-SC Working Groups IEEE 1900.7 WG
04/08/2019 IEEE DySPAN-SC Scope of the DySPAN-SC Dynamic spectrum access radio systems and networks with the focus on improved use of spectrum New techniques and methods of dynamic spectrum access including the management of radio transmission interference Coordination of wireless technologies including network management and information sharing amongst networks deploying different wireless technologies Working Groups 1900.1, , , , IEEE WG White Space Radio Slide 3
4
Project Title and Scope
04/08/2019 Project Title and Scope Title Radio Interface for White Space Dynamic Spectrum Access Radio Systems Supporting Fixed and Mobile Operation Scope This standard specifies a radio interface including medium access control (MAC) sublayer(s) and physical (PHY) layer(s) of white space dynamic spectrum access radio systems supporting fixed and mobile operation in white space frequency bands, while avoiding causing harmful interference to incumbent users in these frequency bands. The standard provides means to support P1900.4a for white space management and P to obtain and exchange sensing related information (spectrum sensing and geolocation information). Slide 4
5
04/08/2019 Current Status IEEE DySPAN-SC ad hoc on WS Radio was preparing PAR during March 2010 – June 2011 PAR was approved in June 2011 WG held the first meeting in September 2011 Work in the WG is scheduled into two phases Preparatory phase September 2011 – June 2012 Draft development phase September 2012 – Slide 5
6
Current Status Topics considered during preparatory phase
04/08/2019 Current Status Topics considered during preparatory phase Radio regulations (with indication of candidate frequency bands) Use cases General requirements Channel model Selection of frequency bands Selection of topology Slide 6
7
Current Status Topics to be considered during draft development phase
04/08/2019 Current Status Topics to be considered during draft development phase System architecture Convergence sublayer MAC sublayer Security sublayer PHY layer Cognitive plane Message encoding MIB Slide 7
8
Current Results: Use Cases
04/08/2019 Current Results: Use Cases Use case categories Wireless backbone networks Wireless access backbone network Wireless mesh backbone network High speed vehicular backbone network Rural broadband network Land fixed/mobile networks Smart home network Digital signage network Transportation logistics network Wireless access network Slide 8
9
Current Results: Use Cases
04/08/2019 Current Results: Use Cases Use case categories Maritime networks Maritime wireless access network Inter-ship mesh network Maritime grid network Home/office networks Home/office network Femto-cell network/vertical handover Smart office / company network (femtocell approach) Vertical handover White space support Slide 9
10
Current Results: General Requirements
04/08/2019 Current Results: General Requirements General requirement categories Architecture related requirements Unique Architecture Cognitive Plane Management/Control plane Data plane Interfaces Network Topology Cost Policy related requirements Channelization Primary system protection Slide 10
11
Current Results: General Requirements
04/08/2019 Current Results: General Requirements General requirement categories Technical requirements Spectrum efficiency Mobility Coverage Flexibility Spectrum access Complexity related requirements System complexity Mobile Terminal Complexity Security related requirement Coexistence related requirements Self-Coexistence Inter-System Coexistence Slide 11
12
Current Results: WG Decisions
04/08/2019 Current Results: WG Decisions Target frequency bands The IEEE WG selects TV white space frequency bands as a target frequency bands for the P1900.7 Topology P shall support point-to-multipoint topology P may support relay stations P may support terminal-to-terminal communication Slide 12
13
Beijing Meeting Results
04/08/2019 Beijing Meeting Results Draft table of contents The IEEE WG has approved the draft table of contents Draft development schedule The IEEE WG has approved the draft development timeline Open call for contributions The IEEE WG has approved the open call for contributions Slide 13
14
Draft Development Schedule
04/08/2019 Draft Development Schedule Year 2011 2012 2013 2014 2015 Meeting 3 4 1 2 Preparatory phase Draft development Draft ToC Development procedure Contributions Approval to start WG letter ballot WG letter ballot IEEE sponsor ballot Slide 14
15
Contribution Schedule
04/08/2019 Contribution Schedule 2012 2013 1 2 3 4 System architecture Convergence sublayer Cognitive plane MAC sublayer PHY layer Security sublayer Message encoding MIB Slide 15
16
WG Constitution WG voting members WG participants
04/08/2019 WG Constitution WG voting members 12 people from 9 affiliations WG participants 47 people Mailing list subscription 77 people Interest in MyProject 96 people Slide 16
17
Participation Tools DySPAN-SC Web page 1900.7 Web page
04/08/2019 Participation Tools DySPAN-SC Web page Web page mailing list MyProject IEEE Communications Society>Standards Committee>White Space Radio Mentor Slide 17
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.