WLTP Phase 1a Round Robin (European plan)

Similar presentations


Presentation on theme: "WLTP Phase 1a Round Robin (European plan)"— Presentation transcript:

1 WLTP Phase 1a Round Robin (European plan)
WLTP-06-28e WLTP Phase 1a Round Robin (European plan)

2 Intention The intention is to assess the repeatability of the test procedure described in the Phase 1a gtr text Labs will be asked to test the golden vehicles to the text of the gtr A golden engineer will record the operation of the test without intrusion This should identify: Areas of possible missinterpretation Errors in the gtr text Missing items from the gtr text Possibilities / necessity to amend the test procedure in Phase 1b

3 Planned Framework Approx 8 Laboratories 5 Manufacturers 3 Non-Industry
2 Golden vehicles (1 petrol, 1 diesel) 1 Golden Engineer European (E5/B5) reference fuels (sourced by each lab) Vehicles re-tested at first lab on completion Exchange at least one golden vehicle (petrol) with Asian RR at end of testing

4 Financing ACEA will co-ordinate the exercise and sponsor the golden engineer Each participating lab shall arrange transport to the next lab Reference fuel and all other test costs shall be borne by each participating lab Golden vehicles shall be supplied by ACEA members

5 ? Preliminary Schedule Diamond Japan Round Vehicle1 India Round
14/3 5 7 9 11 15/1 3 Diamond Vehicle1 Vehicle selection & preparation Japan Round Vehicle2 India Round Engineer Golden Vehicle (p) Vehicle (d) ? Golden and Diamond engineers EU or Japan hub lab. to exchange the observation points. Golden and Diamond engineers India hub lab. to exchange the observation results.