Presentation is loading. Please wait.

Presentation is loading. Please wait.

Mesh Study Group (MES SG) Report IEEE , Jan 12-16, 2004

Similar presentations


Presentation on theme: "Mesh Study Group (MES SG) Report IEEE , Jan 12-16, 2004"— Presentation transcript:

1 Mesh Study Group (MES SG) Report IEEE 802.11, Jan 12-16, 2004
Approved PAR and 5 Criteria: Move that we direct the chair to update the PAR and 5 Criteria incorporating the edits accepted by the Mesh study group and then to take them to the Working Group and request it to forward them to the 802 Executive Committee for approval. Moved by: Colin Lanzl / Mike Moreton SG Result: 32/0/9 PAR/5C Drafts: 04/0054r2 and 04/0056r1 Minutes: 04/0110r2 W. Steven Conner (Intel)

2 Jan 12-16, 2004 Objectives for March Pending WG approval of PAR/5C, resolve any comments received from 802 WG Technical presentations and discussion on architectural considerations and requirements for ESS Mesh W. Steven Conner (Intel)


Download ppt "Mesh Study Group (MES SG) Report IEEE , Jan 12-16, 2004"

Similar presentations


Ads by Google