Download presentation
Presentation is loading. Please wait.
1
Report to AAQG and RMC Project 55 AIR 5493 Rewrite 2005-09-13/14 San Jose dos Campos Brazil
2
P55 – AIR 5493 Rewrite Team Members
Mike Roberts (Champion) Boeing (RMC Chair) Colin Clarke (Leader) Bombardier (Montreal CA) Hollie Last SCC (Ottawa CA) Carl Blazik IAAR Rep (SAI-CRS) (Maumee, OH) Shanya Salamaca RABQSA (Milwaukee Wisc.)
3
Issues to resolve EAQG concern with differentiation between AIEA and AEA APAQG request to include internal audits (should the document be limited to 3rd party audits?) Move oversight requirements to Lee document? Move CRB Competency requirements to another document and which one? Agreement on the term “Auditor Authentication” Include Aviation, Space and Defence or use AQMS? Where to put the 9003 auditor requirements (are they still needed?)
4
Tasks Develop America’s position for unresolved issues Sept 15, 2005
Not complete (AAQG-RMC) Provide final comments on drafts September 26, 2005 Meet with IAQG writing team to finalize documents October 3/4, 2005 (RMC writing team and IAQG writing team) Final approval by IAQG Fall 2005
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.