1
Anthropogenic (man-made) harmful emissions
The Greenhouse Effect Anthropogenic (man-made) harmful emissions ….. and the temperature is constantly rising The Earth is “Burning”….. …..and the temperature rising Severe melting of the ice caps… …to the point of collapse.
2
Organogram Chairman MD Business Development Director Projects Director
Senior PM's Boiler Mech Engineer Proj Engineers Autoclave Head Of Department Pyroliser Chemical/Mech Engineer Pyromet Technical Engineering Head Drawing office Head Draughtsmen x 35 Structural Engineer Mechanical Engineer Civil Engineer Process Engineer Standards Engineer Chemical Engineer Electrical Engineer Instrumentation Engineer Dryer Keith Collins Proj Engineer Seperation Head of Department ReOx Mech Eng Engines Boiler turbine specialist Project Engineers Head Buyer Buyers Technical Director Sales and Marketing Director Sales and Marketing Mngr Traditional Fnce spares and repairs Waste to energy spares Quality Manager QC inspectors Administration Manager Secretarial
3
MSW - Turbine MSW Waste in Autoclaves Cellulose Fibre Drying Oxidation
Steam Raising Turbine Energy to Grid Steam Recyclables
4
MSW – Pyroliser - Turbine
MSW Waste in Autoclaves Cellulose Fibre Drying Pyroliser Steam Raising Turbine Energy to Grid Steam Recyclables
5
Hotels and Condos - waste Autoclaves Sewerage Cake Rotary Dryer
Food Waste Cellulose Hotels and Condos - waste Autoclaves Sewerage Cake Rotary Dryer Energy supplied back to Hotel Boiler Turbine Pyroliser Excess Power to grid
6
Fibre/Waste Wood – Pyroliser – Gas Engine
Waste in Drying Pyroliser Gas Engine Energy to Grid
7
Organic Waste - homogeneous
Wood Waste Feces Pre-sorted waste Rotary Dryer Grinding System Sewerage Cake Waste heat to dryer Excess Power to grid Gas Engines Pyroliser
8
Re-Ox and Pyroliser in start up mode
9
Plant on standby
10
Plant running with one engine
WID LIMITS CO – 50mg/m3 SOx – 50mg/m3 NOx – 200MG/m3 Dioxins and Furans - 0.1ng/m3 Particulates -10mg/m3 VOC’s 10mg/m3
11
Water Analysis Prior to Clean Up
12
Our Current Waste Issues…
Our Global Waste issues…. Our Current Waste Issues… Metals Toxic Waste Household (MSW) Untreated Waste Oil Waste Raw Sewage What is the Solution???
13
Keeping it Simple... We can process... Wood
Sewage Cesspit Animal Manure Wood Garden Oil Sludge Hospital Veterinary Municipal Solid Waste (MSW) Industrial Demolition Commercial Land fill CONTAMINATION AREA Keeping it Simple...
14
Skip Waste... Keeping it Simple... Municipal Solid Waste (MSW)
Industrial Waste Construction & Demolition Commercial Land fill Keeping it Simple...
15
Black Bag Waste... Keeping it Simple... Municipal Solid Waste (MSW)
Industrial Waste Construction & Demolition Commercial Land fill Keeping it Simple...
16
Yellow Bag Waste... Keeping it Simple... Hospital Veterinary
CONTAMINATION AREA Keeping it Simple...
17
Wood Waste... Keeping it Simple... Clean & contaminated timber
Agricultural waste Forestry waste Household garden waste Keeping it Simple...
18
Sewage Waste... Raw Sewage Cesspit Animal Manure Keeping it Simple...
19
Oil Waste... Keeping it Simple... Oil Sludge Engine oil
Contaminated oil Keeping it Simple...
20
Guernsey 3MW Plant.. Only 2 Acres required.. Wood
Sewage Cesspit Animal Manure Wood Garden Oil Sludge Hospital Veterinary Municipal Solid Waste (MSW) Industrial Demolition Commercial Land fill shredder Only 2 Acres required..
21
PTE Autoclave
22
PTE Autoclave – Loading system
23
PTE Autoclave Pyrolisis
24
PTE MSW Processing – 100 000 tpa input
25
PTE MSW Processing – 24 MW – 400 000 tpa input
26
USA Site GA– 65MW – 3000 tons/day
27
100MW Purpose grown biomass plant – phase 1 - 8
28
PTE Wood Waste – Expandable Scheme
29
PTE Wood Waste – Expandable Scheme – 6 to 12 MW
30
PTE Wood Waste – 3 D Model Layout
31
3D Huntingdon Plant Layout
32
PTE Wood Waste – Plan View
33
Pyroliser – P&ID
34
Pyroliser – GAS FLOW THROUGH
35
Wood Waste to Energy Layout – 3 MW
36
Wood Waste to Energy Layout – 6 MW
37
Wood Waste to Energy Layout – 9 MW
38
Wood Waste to Energy Layout – 21 MW
39
Prestige Thermal Dryer – (6 – 10 ton/hr)
40
Prestige Thermal - Thermal Oxidiser
41
Thermal Oxidiser – Reverse Flow System
42
Waste to Energy plant under construction
43
Waste to Energy plant under construction
44
Waste to Energy
45
Thank You.