Presentation is loading. Please wait.

Change Order 4 Contract J06026C01 JIWRF Nonhazardous Site Lighting Upgrade Restore ED Original Delegated Authority Approve Changes to Total Contract.

Similar presentations


Presentation on theme: "Change Order 4 Contract J06026C01 JIWRF Nonhazardous Site Lighting Upgrade Restore ED Original Delegated Authority Approve Changes to Total Contract."— Presentation transcript:

1 Change Order 4 Contract J06026C01 JIWRF Nonhazardous Site Lighting Upgrade Restore ED Original Delegated Authority Approve Changes to Total Contract Cost Commission Agenda Item #11

2 Original Contract Award-J06026C01
Awarded to Next Electric, Inc., March 2018 Construction started April 2018 Scope: Remove and recycle older, less efficient fixtures Replace over 3,400 fixtures at JIWRF

3 Lighting Systems JIWRF has outdated lighting technology
Non-hazardous classification due to fixture location Work includes new bulbs, some fixture changes LED technology This project works towards the District’s 2035 Vision and Energy Plan. It will reduce the amount of electricity used at the plants by replacing a large number of old, inefficient fixtures and replacing them with newer lighting technology that uses much less energy.

4 Conditions Encountered
Some planned bulb replacements could not be performed due to field conditions Fixtures were incompatible due to existing: Ballast condition Wiring configuration Brackets not matching These were issues discovered in the field that was not part of the design contract to identify.

5 Light Fixture Solutions
Direct wire the bulbs and remove the ballasts Replace the entire fixture Option one was chosen for fixtures where it was the cheapest solution that let us keep our focus on energy credits, and we did not lose any efficiencies in the fixture by wiring through the current ballast. Option two was chosen in places where direct wiring the bulb would cost just as much as a new fixture due to the labor intensive nature of certain fixtures and their location.

6 Contract Change Costs CONTRACT AMOUNT % INCREASE AUTHORIZED BY SWMBE
Original $317,364.00 Commission 20.2% Change Order One $30,507.00 10% Executive Director 0% Change Order Two $4,758.50 1% Change Order Three $13,555.20 4% Change Order Four $40,000.00 13% Request of Commission Total Change Orders $94,797.93 28% TOTAL $425,935.86 15.8%

7 Requested Change Order 4
Provide full fixture replacements due to poor existing condition $40,000 Request of Commission

8 QUESTIONS? No need in this case to re-state the request.


Download ppt "Change Order 4 Contract J06026C01 JIWRF Nonhazardous Site Lighting Upgrade Restore ED Original Delegated Authority Approve Changes to Total Contract."