Download presentation
Presentation is loading. Please wait.
1
Accredited Standards Committee C63® - EMC
Secretariat Update Jennifer Santulli C63 ® Secretariat May 2019
2
Accredited Standards Committee C63® - EMC
Status of Standards November May 2019 Standards Inactive/Withdrawn: None PINS Submitted None Standards Published: C63.5/cor1 and C In Ballot Invitation: C63.17 and C63.23 Reaffirmations Ballot close to publication: C63.19
3
Accredited Standards Committee C63® - EMC
Secretariat Action Items Confirm what happens with Dual Interest Categories ANSI stated you can switch back and forth between ballots but for committee balance it would be your primary interest in attending the meeting. Who owns Contributions? Confirm the process for ownership of IP, Software, Scripts, and Firmware. The original owner keeps the ownership of the material however by giving us copyright permissions to use in a standard, they are granting a license to use to IEEE that includes: IEEE has the non-exclusive, irrevocable, royalty-free, worldwide rights (i.e., a license) to use the Contribution in connection with the development of the Work Product for which the Contribution was made. Upon (i) approval of the standard; or (ii) final release or publication of a Work Product by an Industry Connections activity, IEEE has the right to exploit and grant permission to use the Work Product’s content derived from the Contribution in any format or media without restriction. Copyright ownership of the original Contribution is not transferred or assigned to IEEE.
4
Accredited Standards Committee C63® - EMC
Fun Facts from your Secretariat Publication Timeline: Once you have received notice of ANSI Final Action, Lisa Perry is notified to review the document and cross T’s and dot I’s. She will track all her edits and send to the Chair to confirm her changes were correct and she didn’t miss anything Once changes are agreed upon, she uploads it and it is officially published and put on websites THIS PROCESS TAKES 8-12 WEEKS
5
Fun Facts from your Secretariat part 2
Balloting and Comment Resolution Guidelines Google drive for open projects and balloting: I have created a google drive for the Steering Committee (can be extended to others) to view status updates of open projects. I will fill in dates for invites, ballots, BSR’s etc. so you can follow along. REQUST FOR CHAIRS: There is a column for “Estimated Ballot Date”. If your project is nearing the end- please me you expected date for ballot invitation.
6
ASC C63® Open Projects Designation Date SA PINS Date SA BSR8 Status
12/01/2017 C63.8 11/11/2011 C63.9 06/03/2016 C63.10 11/27/2015 C63.11 04/13/2007 C63.14 05/29/2015 C63.19 04/22/2016 03/22/ /06/2019 End of Balloting C63.23 C63.24 11/16/2001 C63.26 C63.27 C63.28 05/16/2014 C63.29 C63.30 C63.31
7
Accredited Standards Committee C63® - EMC
Status of Standards Designation Date Final Action Age in years New PINS on File Action C 4/14/2011 8.00 04/22/2016 None C (R2012) 11/30/2012 6.37 Let Expire C 12/3/2012 6.36 Being Re-Affirmed C 6/27/2013 5.79 11/27/2015 C 8/12/2013 5.67 C 5/13/2014 4.92 S. Berger will see if still being used 5 year notice C 6/13/2014 4.83 12/01/2017 C 8/28/2014 4.62 05/29/2015 C (R2014) 10/16/2014 4.49 06/03/2016 C 1/29/2015 4.20
8
Accredited Standards Committee C63® - EMC (cont’d.)
Designation Date Final Action Age in years New PINS on File Action C 6/18/2015 3.82 None C 12/3/2015 3.36 06/03/2016 C 2/1/2016 3.19 C 10/11/2016 2.50 C 1/19/2017 2.23 12/01/2017 C 7/13/2017 1.75 C63.4a-2017 C 9/15/2017 2017 1.57 1.5 C 12/17/2018 0.32 C corr 1/3/2019 0.27
9
Accredited Standards Committee C63® - EMC No Ongoing Work
Status Action C63.1 Method of Measuring Radio Interference of Electrical Components and Completed Assemblies of Electrical Equipment for the Armed Forces from 150 Kilocycles to 20 Megacycles. C63.3 C63.11 Inter-lab Comparison of EMC Testing AI: Withdraw C American National Standard Guide for the Computation of Errors in Open-Area Test Site Measurements Administratively withdrawn C American National Standard Guide on the Application and Evaluation of EMI Power-Line Filters for Commercial Use Status of Standards
10
ASC C63 Archived Standards (cont’d)
Status of Standards Standard Title Status C63.20 ? C63.21 C (R2012) American National Standard Guide for Automated Electromagnetic Interference Measurements Withdraw
11
Action Items from Steering committee
Confirm PINS for C63.5 and C Add Google Tab for PIN-C Withdraw C63.11 Confirm what happens with a corrigendum once a superseded draft is published
12
AAccredited Standards Committee C63® - EMC
Thank you Questions??
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.