Presentation is loading. Please wait.

Presentation is loading. Please wait.

Compton Run Liping Gan June 18, 2004.

Similar presentations


Presentation on theme: "Compton Run Liping Gan June 18, 2004."— Presentation transcript:

1 Compton Run Liping Gan June 18, 2004

2 Goals A few short runs on 0.5% R.L. 9Be target with different beam intensity to study photon flux effect (~2 h). A clean run on 0.5% 9Be target (~20 h) Cross section measurement Energy calibration Short run on 5% R.L. 12C (~1-2 h) Check Z dependence Normalization to the PrimEx physics target Cross check the system error of setup Take single arm data during production run

3 9Be 0.5% R.L. target, Ne=8.72X1022 e/cm2 Q~107 γ/sec
One E-counter, ΔE/E=3X10-3 For Eγ=4 GeV Rate=0.2Hz #event=14400 for 20 hours

4 12C 5% R.L. target, Ne=6.42X1023 e/cm2 Q~107 γ/sec
two E-counter, ΔE/E=6X10-3 For Eγ=4.8 GeV Rate=2.8 Hz #event=10080 for 1 hours

5 207Pb 5% R.L. target, Ne=7.58X1022 e/cm2 Q~107 γ/sec
two E-counter, ΔE/E=6X10-3 For Eγ=4.8 GeV Rate=0.33 Hz #event=1200 for 1 hours

6 Special requirement for trigger
Make coincidence of tagger MOR and two-cluster on Hycal. PS magnet off Open additional E-counters at Eγ: 2GeV, 3GeV, 3.5GeV, in order to increase the Compton events hitting on lead glass part of HYCAL Set HYCAL cluster energy deposition threshold 200 MeV level.


Download ppt "Compton Run Liping Gan June 18, 2004."

Similar presentations


Ads by Google