11/7 MD 10/31 EA HT DB EA 10/31 11/2 (3) 1 days 11/2 (3) 1 days 7 days

Similar presentations


Presentation on theme: "11/7 MD 10/31 EA HT DB EA 10/31 11/2 (3) 1 days 11/2 (3) 1 days 7 days"— Presentation transcript:

1 11/7 MD 10/31 EA HT DB EA 10/31 11/2 (3) 1 days 11/2 (3) 1 days 7 days
BOM 10 days 11/2 (3) Aesthetic CAD drawings Mark approval 7 days 10/31 1 days Set Test procedure 1 days Low effort egress ingress EA Finalize metrics Conduct Test Survey Gather volunteer Sidecar experience HT BOM Prototype ready Test Survey Survey 7 days Tube design and bike design DB BOM 10 days 11/2 (3) CAD drawings Mark approval 7 days Ergonomics EA 1 days 10/31 Set Test procedure 1 days Finalize metrics Conduct Test Survey Gather volunteer

2 JD MD EA 10/31 10/31 EA 3 days 3 days 0.5 day 7 days 0.5 day 1 days
DOT requirement Find all requirements Create checklist BOM Complete checklist 7 days BOM Aerodynamic function MD 7 days Measure cross section Set Test procedure Drawings Waiver EA 1 day 10/31 3 days Ingress Time Gather volunteer Finalize metrics Conduct Test Analysis report BOM 7 days Getting proto material Set Test procedure 1 day Gather volunteer 10/31 3 days Egress Time EA Finalize metrics BOM Conduct Test Analysis report Getting proto material

3 ? MD DB MD 3 days 1-3 days 11/2 (3) 3 days 3 days 1-3 days 4 days
Research splash requirements Splash proof MD Finalize BOM MArk approval of windshield Complete checklist Create checklist 7 days Storage DB BOM 10 days 11/2 (3) CAD drawings Mark approval Stock lighting 0.5 day 0.5 day 3 days 1 days Find all requirements Create checklist Check light Complete checklist 3 days 3 days 1-3 days 1/7 days 4 days Research windshield requirements windshield MD BOM Finalize windshield acquirement route Mark approval of windshield Complete report Create checklist

4 HT DB DB JD DB 3 days 1 days 3 days 3 days 1 days 3 days 1 days 7 days
Safety HT Find all requirements Create checklist BOM Safety report 7 days 1 days Finalize BOM DB Production Cost Cost report Investigate parts quotes 7 days 1 days 3 days Current bolt pattern DB BOM Dimension frame Parts drawings Finish CAD design 7 days 1 days 3 days 3 days JD Producable in20 hr BOM Finalize material Finalize Manufacturing procedure Manufacturing Reports 7 days 1 days DB Finalize BOM Weight less than 180 lb Weight sheet Investigate parts quotes

5 8 task added