Presentation is loading. Please wait.

Presentation is loading. Please wait.

Why J3068? – Issues in the field

Similar presentations


Presentation on theme: "Why J3068? – Issues in the field"— Presentation transcript:

1 Why J3068? – Issues in the field
There are a variety of heavy and medium duty electric vehicles with on-board three phase AC chargers using a variety of plugs including some proprietary systems. Some common issues Some use standard NEMA or IEC outlets that are always energized for EV Some lack plug proximity or interlock to prevent decoupling while charging, which causes arcing Supply without ground fault protection Three-phase school bus in California SAE J3068

2 SAE J3068 Inlet Configurations Description
Utilizable Nominal Input Voltages J3068 AC6 AC only VACnom 208/120Y, 480/277Y, 600/347Y J3068 AC6/DC8 AC on 6mm pins DC on 8mm pins VDC max J3068 DC8 DC on 8mm pins only Note: Other configurations are not currently discussed in the document SAE J3068

3 J3068 News and Updates Meetings and documents
Important meeting next week DRAFT POSTING – PLEASE review and comment Demonstration project Start planning for interoperability testing Ensure availability of tested / listed components to build J3068 systems for North American market SAE J3068

4 Joining the Task Force (TEVHYB13)
Two documents are being developed under the SAE Medium and Heavy Duty Vehicle Conductive Charging Task Force EV Power Transfer using Overhead Coupler (J3105) EV Power Transfer using Three-phase Capable Coupler (J3068) Download the form to join the task force Return to SAE Staff: Pat Ebejer Questions? SAE TEVHYB13


Download ppt "Why J3068? – Issues in the field"

Similar presentations


Ads by Google