Presentation is loading. Please wait.

Presentation is loading. Please wait.

Nov 19, 2009 Atlanta, GA Session #64

Similar presentations


Presentation on theme: "Nov 19, 2009 Atlanta, GA Session #64"— Presentation transcript:

1 Nov 19, 2009 Atlanta, GA Session #64
802.16m Closing Report Nov 19, 2009 Atlanta, GA Session #64 11/19/2009 801.16m-09/0052

2 802.16m Closing Report – Atlanta
Into Session #64: LB 30a: 61% return rate; 56% approval Unresolved Comments on D2 Amendment Text (Letter Ballot #30a; /0058r1) 1102 unresolved non-editorial: 551 MAC 320 PHY 231 Misc 466 editorial comments Several thousand reply comments 453 contributions 203 MAC 160 PHY 38 Femto 5 Multi-BS MIMO 21 Relay 10 SON 5 LBS 11 e-MBS 11/19/2009 801.16m-09/0052

3 802.16m Closing Report- Atlanta
Plan for the week: Resolve ALL Letter Ballot comments Completed! Primary comment resolution groups on PHY, Upper MAC and Lower MAC during daytime hours Organized evening Ad–Hocs on Idle & Sleep, Handover, Security, Addressing and Headers, MultiCarrier, Femto, MIMO and E-MBS/Relay to resolve LB comments received on those topics. The Ad-Hocs were EXTREMELY SUCCESSFUL Authorized the Editor to create P802.16m/D3 based on the comment resolutions contained in m-09/0058r3 and request WG LB recirc 11/19/2009 801.16m-09/0052

4 802.16m Closing Report- Atlanta
Motion to WG: Request that the WG initiate a WG LB #30b recirculation on P802.16m-09/D3, in which the entire draft is open for comment. 11/19/2009 801.16m-09/0052


Download ppt "Nov 19, 2009 Atlanta, GA Session #64"

Similar presentations


Ads by Google