Download presentation
Presentation is loading. Please wait.
Published byΦιλομήλ Αποστολίδης Modified over 5 years ago
1
2040 Comprehensive Plan UPDATES PER MET COUNCIL| 14 MAY 2019
2
General Information Process:
Original Plan submitted to Met Council - Dec. 2018 Incomplete Letter received Jan. 2019 Forecasts Land Use Housing Surface Water Wastewater Implementation Water Supply (handled separately) -address -zoning -lot size
3
Forecasts / Land Use Future land use map must accommodate housing, population and employment growth -address -zoning -lot size
4
Forecasts / Land Use Changed future land use category names to better reflect the underlying zoning districts -address -zoning -lot size
5
Forecasts / Land Use Changed future land use category names to better reflect the underlying zoning districts -address -zoning -lot size
6
Forecasts / Land Use “Projected Development Lands” map Vacant
Buildable Potential for development / redevelopment
7
Forecasts / Land Use
8
Housing Affordable housing Allocation = 14 units
9
Housing Housing Tools:
List of commonly used tools and when (if) the City would use them (starting p. 36)
10
Housing Other Housing Tools for Consideration: TIF
4(d) tax incentive (local reduction in tax rate for keeping existing units affordable) Tax abatements Low Income Tax Credits (LIHTC) Rental inspection/licensing Fee waivers Community Land Trusts/Land Banks
11
Wastewater Addition of the intercommunity service agreement with the City of Shorewood A new Capacity Analysis section with tables depicting the local system capacity Required local data for inflow and infiltration in the public and private sewer systems Information on local programs for addressing excessive inflow and infiltration
12
Surface Water Revised to address requirements of the MCWD and Minnesota Department of Natural Resources (MN DNR). Additional mapping and data Problem assessment Plan for coordinating with the MCWD The Metropolitan Council requested the Water Supply plan currently under review by the MN DNR to be supplied to the Metropolitan Council with resubmission of the Comprehensive Plan.
13
Next Steps City Council approval to resubmit
Resubmit to the Met Council (2nd Incomplete Letter?) 15-day review for completeness 120-day review period Approval by Met Council Final approval by City Council
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.