Presentation is loading. Please wait.

Presentation is loading. Please wait.

Liaison Report Date: Authors: September 2010

Similar presentations


Presentation on theme: "Liaison Report Date: Authors: September 2010"— Presentation transcript:

1 802.15 Liaison Report Date: 2010-09-17 Authors: September 2010
September 2010January 2009September 2008 January 2009September 2008 September 2008 doc.: IEEE /xxxxr0 September 2010 Liaison Report Date: Authors: Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics

2 Abstract Liaison report on 802.15 as presented to 802.11
September 2008 January 2009September 2008 September 2010January 2009September 2008 doc.: IEEE /xxxxr0 September 2010 Abstract Liaison report on as presented to Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung Electronics

3 September 2008 September 2010January 2009September 2008 May 2008 January 2009September 2008 doc.: IEEE /0697r0 doc.: IEEE /xxxxr0 September 2010 Slide 3 Slide 3 Clint Chaplin, Samsung Electronics Page 3 Page 3 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

4 September 2008 May 2008 September 2010January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 September 2010 e MAC amendments First Initial WG ballot LB53 on D1.0 closed May 17, Results were 120/43/ % Affirmative: Fails 1643 comments: 1152 Technical, 491 Editorial Resolved all comments Authorized editor to incorporate comment resolutions into draft Go out for second Initial WG ballot after draft is complete Slide 4 Slide 4 Clint Chaplin, Samsung Electronics Page 4 Page 4 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

5 802.15.4f RFID Working on writing the first draft.
September 2008 May 2008 September 2010January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 September 2010 f RFID Working on writing the first draft. Draft still not yet finished; hoping to finish in November and go out for first Initial WG ballot after November meeting Slide 5 Slide 5 Clint Chaplin, Samsung Electronics Page 5 Page 5 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

6 802.15.4g Smart Utility Networks
September 2008 May 2008 September 2010January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 September 2010 g Smart Utility Networks First Initial WG ballot LB51 on D1.0 closed May 12, Results were 128/45/ % Affirmative: Fails 1816 comments: 1301 Technical, 515 Editorial Resolved all but 13 technical comments and all editorial comments Edited draft to reflect comment resolutions Authorized to start a new Initial WG Ballot Slide 6 Slide 6 Clint Chaplin, Samsung Electronics Page 6 Page 6 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

7 September 2008 May 2008 September 2010January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 September 2010 h Corregendum First WG ballot on D1.0 closed May 13, Results were 160/7/ % Affirmative: Passed! 111 comments: 65 Technical, 46 Editorial Still working on resolving comments Slide 7 Slide 7 Clint Chaplin, Samsung Electronics Page 7 Page 7 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

8 802.15.4i Rollup Chair nominations and confirmation Reviewed D00
September 2008 May 2008 September 2010January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 September 2010 i Rollup Chair nominations and confirmation Reviewed D00 Decided on new editorial structure for Agreed to list of changes for D01 Voted to go to initial letter ballot Probably incorporate h into draft; h goes away Slide 8 Slide 8 Clint Chaplin, Samsung Electronics Page 8 Page 8 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

9 802.15.6 Wireless Body Area Networks
September 2008 November 2007 September 2010January 2009September 2008 doc.: IEEE /2752r1 doc.: IEEE /1003r0 September 2010 Wireless Body Area Networks First Initial WG Ballot LB55 closed July 8, Results: 122/37/14; 76.73%. Passed! Total 2418 comments Resolved all but 13 comments. Made and passed motion to resolve remaining comments with “reject” but with no reason. Empowered editor to create draft 2, but gave no instructions to the editor. Deficiencies in process were pointed out in closing plenary. Recirculation is put off until November, and deficiencies will have to be addressed. Slide 9 Slide 9 Page 9 Page 9 Alex Ashley, NDS Ltd Peter Ecclesine, Cisco Systems

10 802.15.7 Visible Light Communication
September 2008 May 2008 September 2010January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 September 2010 Visible Light Communication First recirculation WG ballot on D2.0 closed April 7, Results were 104/19/ % Affirmative: Passed! 810 comments: 397 Technical, 413 Editorial Finished resolving all comments: 4 days of ad-hoc last week, all possible session time this week (including evenings) Now editing comment resolutions into draft. Also editing results of MEC into draft. Hoping to start first recirculation WG ballot in late early October Empowered a Comment Resolution Oversight Committee to act on behalf of WG to oversee comment resolution process after recirculation. Slide 10 Slide 10 Clint Chaplin, Samsung Electronics Page 10 Page 10 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

11 Low Energy Critical Infrastructure Monitoring
September 2008 May 2008 September 2010January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 September 2010 Low Energy Critical Infrastructure Monitoring PAR and 5C approved by Study Group and WG leci-sglecim-par-draft.docx leci-sglecim-5c-draft.docx Slide 11 Slide 11 Clint Chaplin, Samsung Electronics Page 11 Page 11 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

12 Personal Space Communications
September 2008 May 2008 September 2010January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 September 2010 Personal Space Communications PAR and 5C approved by Study Group and WG psc-sg-psc-draft-par.doc psc-sg-psc-draft-5c.doc Slide 12 Slide 12 Clint Chaplin, Samsung Electronics Page 12 Page 12 Clint Chaplin, Samsung Electronics Clint Chaplin, Samsung

13 References This document All Documents
September 2008 May 2008 September 2010January 2009September 2008 January 2009September 2008 doc.: IEEE /xxxxr0 doc.: IEEE /0697r0 September 2010 References This document All Documents Current draft is in the members-only area  Members_Only_Area members log in using username and password Slide 13 Clint Chaplin, Samsung Electronics Page 13 Clint Chaplin, Samsung Clint Chaplin, Samsung Electronics


Download ppt "Liaison Report Date: Authors: September 2010"

Similar presentations


Ads by Google