Download presentation
Presentation is loading. Please wait.
Published byDries Michiels Modified over 5 years ago
1
July 2019 IEEE P Spectrum Characterization and Occupancy to Sponsor Ballot Bob Heile Chair, IEEE Bob Heile, Decawave
2
July 2019 IEEE P Spectrum Characterization and Occupancy to Sponsor Ballot IEEE WG Letter Ballot Launch Date # of Comments Received Comment Resolution Status Response Ratio Approval Ratio Draft Status WG LB #1 (P Draft v1.0) February 12th 2017 to March 13th 2017 153 Comments were addressed and Resolved 76% 17% P Draft v2.0 Prepared WG LB #2 (P Draft v2.0) October1st to October 30th 2017 95 77% 50% P Draft v3.0 Prepared WG LB #3 (P Draft 3.0) February21st to March 4th 2018 60 61.54% 60% P Draft v4.0 prepared WG LB #4 (P Draft 4.0) October 2nd to October 31st 2018 72 Comments were addressed and resolved 73% 71% P Draft v5.0 prepared WG LB #5 (P Draft 5.0) Feb 18th 2019 to March 20th 2019 55 NO MUST BE SATISFIED COMMENTS 75% 9 yes 9 returned 12 voters 100% P Draft v6.0 prepared to start the Sponsor Ballot Bob Heile, Decawave
3
July 2019 IEEE P Spectrum Characterization and Occupancy to Sponsor Ballot Last Ballot on D5 was unanimous MEC review successfully completed. No actions required prior to SA Ballot. Two commenters submitted 55 non-MBS comments Both commenters have withdrawn their comments. An unchanged draft D5 would go to SA Ballot Comment Resolution Spreadsheet can be found at: Bob Heile, Decawave
4
July 2019 IEEE P Spectrum Characterization and Occupancy to Sponsor Ballot Motion Approve sending D05 to SA Ballot Confirm the CSD for in (WG ) Mover: Heile Second: Mody Bob Heile, Decawave
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.