1 Service test

2 VXD services (between VXD and QCS)
Cooling pipe and BPM cable should be green hatch area. Red area is movable, then such component should not be located 7mm clearance is agreed between VXD and RVC The design work should be finished before Sep. Service test is scheduled in Sep. at MPI.

3 Service work around Docks
VXD and BEAST dock location have already defined. Next step is to check feasibility of cabling work (it will be tested in Sep.) Need to verify cable space Brackets design and production

4 Check and discussion points
Clearance check between RVC and VXD service (7mm) Clearance check between QCS and CDC How to fix each service? What kind of brackets are good to use? And more