Presentation is loading. Please wait.

Presentation is loading. Please wait.

Specifications for the XFEL Beam Switchyard Kickers

Similar presentations


Presentation on theme: "Specifications for the XFEL Beam Switchyard Kickers"— Presentation transcript:

1 Specifications for the XFEL Beam Switchyard Kickers
Winni Decking FEL-Beam-Dynamics-Meeting Winni Decking

2 pulser prototype measurement pulser prototype measurement
Beam Distribution 15o deflection to Dump 2.2o arc to SASE 2 200 ns 300 ms low accuracy (>1 %) 5 MHz burst operation high accuracy (< 0.01 %) 10 Hz operation pulser prototype measurement pulser prototype measurement Winni Decking

3 Emittance Growth due to incoh. Synchrotron Radiation
Relative emittance growth per 1deg bend at 25 GeV Max. bending radius < 300 m (to allow for fast separation) => max beta-function ≈ 40 m Winni Decking

4 Beam Switchyard Optics
to T1 to dump to T20 15o deflection to Dump 2.2o arc to SASE 2 Winni Decking

5 Distribution: Kicker Strength & Stability
kicked un-kicked Septum thickness: xseptum=5 mm Tolerable jitter: njitter=0.1 s Collimation depth: mcollimation=85 s Beta at Septum: bseptum=30 m <Beta> at Kicker: bkicker=25 m Septum Winni Decking

6 Kick Trajectory 0.5 mrad kick required Winni Decking

7 XFEL BD Kicker amd Septum Specs
Fast single bunch kicker (for beam dump) Flat top kicker (for beam distribution) Pulse Form Burst Flat top Repetition Rate Hz 5×106 10 Max. Pulse Width s 200×10-9 300×10-6 Rise/Fall Time < 100×10-9 ≈20×10-6 Rel. Amplitude Stability 0.01 3×10-4 Relative Residual Ripple Kick angle mrad 0.5 Max. int. Field Strength mT×m 42 Min. full aperture mm 30 Max. system length m 18 Winni Decking

8 In or out of vacuum stripline kicker with d= stripline distance
Kicker Layout In or out of vacuum stripline kicker with d= stripline distance Decrease of vacuum chamber size helpful Test on ongoing for sputtering of d<20 mm ceramics 100 s at kicker location approx 3.5 mm Winni Decking

9 Possible Tests at FLASH
Realization of the extraction scheme at FLASH (i.e. kicker + septum + beam dump) at an early stage would allow to test the complete hardware for the XFEL setup Installation can later be re-used for FLASH-II Only ‘minor’ redesign of upstream collimator beamline and bypass necessary kickers (2) septum quadrupoles (5) sextupoles (3) dipoles (2) ? collimator (new position is not optimized yet) shielding wall energy collimator (position is not optimized yet; could be interchanged with position of one of sextupoles) courtesy of Nina Golubeva and Vladimir Balandin Winni Decking


Download ppt "Specifications for the XFEL Beam Switchyard Kickers"

Similar presentations


Ads by Google