Download presentation
Presentation is loading. Please wait.
Published byNoah Markussen Modified over 5 years ago
1
ITU-R Liaison Group Report - Session #61 Opening Plenary
IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE L /0047 Date Submitted: Source: Reza Arefi Voice: Intel Corporation Venue: IEEE Session #61, WG Opening Plenary Base Contribution: None. Purpose: ITU-R Liaison Group presentation to Opening Plenary of the WG, containing plan for the week Notice: This document does not represent the agreed views of the IEEE Working Group or any of its subgroups. It represents only the views of the participants listed in the “Source(s)” field above. It is offered as a basis for discussion. It is not binding on the contributor(s), who reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy: The contributor is familiar with the IEEE-SA Patent Policy and Procedures: < and < Further information is located at < and < >.
2
ITU-R Liaison Group Report - Session #61 Opening Plenary
Reza Arefi 802.16’s ITU-R Liaison Official IEEE Session #61 Cairo, Egypt, 4-7 May 2009
3
Relevant Documents from Session #60
IEEE L /058r3 IEEE ITU-R Liaison Group Workplan IEEE L /0039r1 ITU-R Liaison Group Report to Closing Plenary of Session #60 IEEE L /0036r1 Call for Comments and Contributions for IMT-Advanced submission templates and Simulation Package ========== Also =========== IEEE L /079 IEEE IMT-Advanced review process (IEEE /r6)
4
Input Documents for Session #61
Contributions submitted on IMT-Advanced work including to the correspondence group IEEE C802.16itu-09/0009 – Input on TDT Characteristics IEEE C802.16itu-09/0010r1 – Input on LBT IEEE C802.16itu-09/0011 – Input on TDT Characteristics IEEE C802.16itu-09/0012 – Input on TDT Characteristics IEEE C802.16itu-09/0013r1 – Input on Simulation Assumptions IEEE C802.16itu-09/0014 – Preliminary results for PCT Liaison Statement from the WiMAX Forum TWG IEEE L /0045 – Input on TDT Characteristics Liaison Statement from ARIB on IMT-Advanced IEEE L /0044 – Preparations on IMT-Advanced Liaison Statement from TTA on IMT-Advanced IEEE L /0046 – Cooperation for IMT-Advanced Liaison Statement from Femto Forum IEEE L /0042 – Parameters for WP 5D Liaison Statement from ITU-R Working Party 5D IEEE L /0016: Liaison statement from ITU-R Working Party 5D regarding Femto cells ( )
5
Proposed Objectives for Session #61
per Workplan Review contribution #2 on IMT-Advanced, update if necessary Initiate development of final submission for IMT-Advanced Review input contributions. Update drafts of TDT (incl. LBT), SCT, and SPECT. Prepare CfC on PCT, including supporting simulations Prepare contributions towards update of Revision 9 of M.1457 beyond Workplan Consider other input(s) to ITU on IMT-2000 update, IMT-Advanced, and other topics as appropriate, submit to for review as appropriate Review input liaison statements, prepare responses, and communicate with other groups as appropriate Update workplan regarding IMT-2000 and IMT-Advanced activities as appropriate
6
Proposed Agenda for the Week
Monday Tuesday Wednesday Thursday AM 4) Review input contributions on IMT-Advanced and update drafts of working documents 6) Initiate development of final submission on IMT-Advanced 7) Prepare CfC on PCT and supporting simulations PM 1) Introduction and approval of the agenda 2) Review and follow workplan of IEEE L /058r3 3) Consider correspondence group activity 4) Review input contributions on IMT-Advanced and update drafts of working documents 5) Review contribution #2, update if necessary 8) Prepare contributions towards Revision 9 of M.1457 9) Prepare responses for input Liaison Statements 10) Update work plan 11) Other business
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.