Download presentation
Presentation is loading. Please wait.
Published byIda Iskandar Modified over 5 years ago
1
Met Office contribution to GIFS-TIGGE / SWFDP collaboration
(part of GEOWOW project WP4) Richard Swinbank GIFS-TIGGE WG meeting, June 2013
2
Multi-model ensemble forecasts of Sandy
Multi-model version of the track and strike probability plots –now available for SWFDP. Combines track forecasts from Met Office (UKMO), ECMWF and NCEP(USA)
3
Additional tropical cyclone products
Time series of forecast measures of cyclone intensity NB. Although these forecasts give a good indication of the intensification of Sandy, global ensemble models are currently too coarse for quantitatively accurate TC intensity forecasts.
4
Task 4.3 challenge Forecasting severe weather
SWFDP survey confirmed the need for near real-time version of severe weather products Joint proposal developed by Met Office, JMA, MRI. High-priority subset of products to be generated in real time at Met Office, then transferred to SWFDP users.
5
Near real-time processing of SW products
Current delayed-mode processing shown in red. Planned real-time processing in green.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.