Presentation is loading. Please wait.

Presentation is loading. Please wait.

Gorge EI Analysis Presented to the Gorge Study Technical Team By

Similar presentations


Presentation on theme: "Gorge EI Analysis Presented to the Gorge Study Technical Team By"— Presentation transcript:

1 Gorge EI Analysis Presented to the Gorge Study Technical Team By
Christopher Swab Oregon Department of Environmental Quality Air Quality Division, Technical Services July 25, 2007

2 Anthropogenic vs. Non-Anthropogenic emissions
Pulp & Paper and Primary Aluminum Production growth held steady from 2004 through 2018 TransAlta Centralia Generation facility location Anthropogenic SOX emissions

3 PSAT Regions

4

5

6

7 TransAlta Centralia Generation facility
2018 EI dataset: Lat = (correct) Long = 2004 EI dataset: Lat = Long = PSAT Region West of Gorge Northwest of Gorge Portland

8 Should be moved to West of Gorge

9

10

11


Download ppt "Gorge EI Analysis Presented to the Gorge Study Technical Team By"

Similar presentations


Ads by Google