Presentation is loading. Please wait.

Presentation is loading. Please wait.

MAE 435 Progress Report II 4/2/13.

Similar presentations


Presentation on theme: "MAE 435 Progress Report II 4/2/13."— Presentation transcript:

1 MAE 435 Progress Report II 4/2/13

2 MAE 435 Raising Canes Fundraiser (over $180)
Panda Express Fundraiser (over $150) Very Generous Donation From Dr.Chaturvedi ($2)

3 Aerodynamics Team Finalizing nose cone mold (XVD longboards)
Analysis was completed on body panels (~63% lighter) Side pods are completed Next step will be fabricate nose cone and assemble body panels

4 Chassis Team Fabricated front & rear brake caliper mounts
Fabricating shifter & pedals Waiting on L&W parts Completing welding of entire frame

5 Powertrain Team Exhaust System is 100% Complete Wiring is 80% Complete
Fuel system is 60% Complete Differential / Rear Brake Rotor are 100% Complete No progress on Air Intake


Download ppt "MAE 435 Progress Report II 4/2/13."

Similar presentations


Ads by Google