Download presentation
Presentation is loading. Please wait.
1
MAE 435 Progress Report II 4/2/13
2
MAE 435 Raising Canes Fundraiser (over $180)
Panda Express Fundraiser (over $150) Very Generous Donation From Dr.Chaturvedi ($2)
3
Aerodynamics Team Finalizing nose cone mold (XVD longboards)
Analysis was completed on body panels (~63% lighter) Side pods are completed Next step will be fabricate nose cone and assemble body panels
4
Chassis Team Fabricated front & rear brake caliper mounts
Fabricating shifter & pedals Waiting on L&W parts Completing welding of entire frame
5
Powertrain Team Exhaust System is 100% Complete Wiring is 80% Complete
Fuel system is 60% Complete Differential / Rear Brake Rotor are 100% Complete No progress on Air Intake
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.