Systems Division Mini-conference, 2 Oct 2013 REPOINT Phase 2: a.k.a ‘If you think you’re so smart, go ahead and build one…’ Samuel Bemment Loughborough University Dr. Roger Dixon UKACC PhD Presentation Showcase
2
Introduction Railway track switch designs have remained similar since Victorian times REPOINT ( ) explored benefits of re-engineering Step change in capacity Junction control rule changes One design very promising 3 patents REPOINT 2 ( ) to build lab-scale demonstrator
3
Systems Division Mini-conference, 19 Sept 2013
4
Systems Division Mini-conference, 19 Sept 2013
5
Phase 2 Project Plan 15 Months from June 2013,
£356k funding from ‘Enabling Innovation Team’ Concept Refinement, Subsystem Design and Validation, Outline Design Deliverable: Concept Demonstration in Lab and Outline Designs
6
Building a REPOINT HiTL Demonstrator
Start small…
7
Building a REPOINT HiTL Demonstrator
Aim Bigger…
8
Capacity of rail networks depends upon switches
Summary Capacity of rail networks depends upon switches Switch technology is the limiting factor We are prototyping a novel switch design The design is simple, but it will need control engineering to function There are many other knock-on benefits (too many for 4 minutes) …Thanks for listening! £ Billions