Presentation is loading. Please wait.

Presentation is loading. Please wait.

TGaq Next Steps Date: Authors: July 2014 July 2014

Similar presentations


Presentation on theme: "TGaq Next Steps Date: Authors: July 2014 July 2014"— Presentation transcript:

1 TGaq Next Steps Date: 2014-07-14 Authors: July 2014 July 2014
doc.: IEEE /0876r0 July 2014 TGaq Next Steps Date: Authors: Stephen McCann, Blackberry Stephen McCann, Blackberry

2 Need to move forward with D0.01 Work to be done to get to D0.02
July 2014 doc.: IEEE /0876r0 July 2014 Need to move forward with D0.01 Work to be done to get to D0.02 Possibly start a comment collection on D0.02 How do we move forward and what topics can be covered this week? CAG number Service updates in infrastructure Push Pull Prompt Proxy Stephen McCann, Blackberry Stephen McCann, Blackberry

3 Service Type/Service Class
July 2014 doc.: IEEE /0876r0 July 2014 Service Type/Service Class Currently in TGah Draft 2.0 Noticed in letter ballot Are we concerned about this? Stephen McCann, Blackberry Stephen McCann, Blackberry

4 Generate normative text for the following examples:
July 2014 doc.: IEEE /0876r0 July 2014 Annexes Generate normative text for the following examples: UPnP Bonjour ANDSF Stephen McCann, Blackberry Stephen McCann, Blackberry

5 Proxy Others Rename as “PADPrxy”
July 2014 doc.: IEEE /0876r0 July 2014 Proxy Rename as “PADPrxy” Revise diagrams (tidy up and make clear) More text Others Service type for VoIP? ANDSF requires TLS to start at the STA? GAS/PADP min/max response (transaction times) Stephen McCann, Blackberry Stephen McCann, Blackberry


Download ppt "TGaq Next Steps Date: Authors: July 2014 July 2014"

Similar presentations


Ads by Google