DOE Electrical Safety Handbook

Similar presentations


Presentation on theme: "DOE Electrical Safety Handbook"— Presentation transcript:

1 DOE Electrical Safety Handbook
2016 EFCOG Electrical Safety Workshop Lloyd Gordon Mike Hicks Tommy Martinez Jeff Williams

2 Topics Background 2016 Workshop progress Headquarters support
Content outline Path forward

3 History of Handbook 1990 - 1993 Development (facility only)
draft, Chapters 1 - 8 , R&D Development January release attempt to eliminate March st R&D Electrical Safety Meeting/Workshop April Edit to Handbook due December Revised handbook, added excavation March nd R&D Electrical Safety Meeting/Workshop March rd R&D Electrical Safety Meeting/Workshop July st Joint DOE Electrical Safety Workshop

4 History of Handbook – cont.
October revision finalized January 1, 2009 – was submitted to DOE Back to the drawing board revised Electrical Safety Handbook, 2 new chapters Added equipment approval and hazard classification 2010 – 2013 editing, code referencing, reorganization, REVCOM 2013 published, two new EFCOG chapter pushed to appendices, controversial (it took 6 years to revise) 2016 EFCOG working group, plan how to proceed 2018 EFCOG – this update

5 DOE Handbook – 2004 revision – leads Bobby Gray, Lloyd Gordon
1.0 Introduction 2.0 General Requirements 3.0 Electrical Preventive Maintenance 4.0 Grounding 5.0 Special Occupancies 6.0 Requirements for Specific Equipment 7.0 Work in Excess of 600 V 8.0 Temporary Wiring 9.0 Enclosed Electrical/Electronic Equipment 10.0 Research and Development 11.0 Electrical Safety During Excavations – EFCOG product 12.0 References Appendix A - DOE Model Electrical Safety Program Appendix B - Acronyms and Definitions Appendix C - Work Matrices - Examples Appendix D - Regulation Matrices

6 DOE Electrical Safety Handbook – 2013 leads – Bobby Gray, Lloyd Gordon red – EFCOG products
Introduction general General Requirements general Hazard Analysis see Appendix D Electrical Preventive Maintenance code Grounding code Special Occupancies code, explosives Requirements for Specific Equipment code Work in Excess of 600 V code Temporary Wiring code Electrical Safety During Excavation code Enclosed Electrical/Electronic Equipment R&D Unlisted Electrical Equipment Approval see Appendix C Research and Development R&D A – DOE Model Electrical Safety Program B – Acronyms and Definitions code C – Unlisted Electrical Equipment R&D D – Hazard Analysis R&D E – Referenced Citations code F – Severity Tool EFCOG

7 2016 Working Group Goal To eliminate code repetition
eliminate sections that are a repeat of existing codes and standards (NEC, 70E, NESC) this shifts the focus to an R&D handbook Reorder the handbook to include all material in main body, in a manner that flows To brainstorm new sections To consider options for a path forward for publication

8 2016 Working Group Members Mike Hicks, DOE INL Lloyd Gordon, LANL
Tim Snow, NREL Richard Green, LLNL Don Bourcier, LANL Eugene Santiago, BNL Joe Kilar, ANL retired John Lacenere, PPPL John Echave, LANL Marion Wilde, SNL retired Mark Mathews, ORNL retired Terry Meisinger, HQ-DOE

9 2016 Working Group Products
Went through complete handbook, marked for: elimination consideration for reduction/elimination update Listed ideas for new material Proposed options for path forward for publication Had conference call with headquarters

10 Options for DOE Electrical Safety Handbook path forward
Updates to existing handbook, DOE Updates and add new material, DOE Completely restructure handbook, DOE Eliminate redundant code info, reorder Break into two handbooks Existing application of codes to labs, DOE Research laboratories, Science and NNSA, EFCOG Pull handbook out of DOE, make it EFCOG handbook Headquarters committed to support and expedite publication of handbook

11 DOE Electrical Safety Handbook – 2 Handbooks
Introduction general General Requirements general Electrical Preventive Maintenance code Grounding code Special Occupancies code, explosives Requirements for Specific Equipment code Work in Excess of 600 V code Temporary Wiring code Electrical Safety During Excavation code A – DOE Model Electrical Safety Program B – Acronyms and Definitions code E – Referenced Citations code Introduction general General Requirements general Hazard Analysis R&D, both Risk Assessment both Enclosed Electrical/Electronic Equipment R&D Unlisted Electrical Equipment Approval R&D Research and Development R&D Electrical Severity Measurement Tool A – Acronyms and Definitions code

12 EFCOG Electrical Safety Handbook
Introduction General Requirements Hazard Analysis Risk Assessment Enclosed Electrical/Electronic Equipment Unlisted Electrical Equipment Approval Research and Development Electrical Severity Measurement Tool A – Acronyms and Definitions

13 DOE Electrical Safety Handbook - accepted
Introduction general General Requirements general Hazard Analysis R&D, both Risk Assessment both Electrical Preventive Maintenance code Grounding code Special Occupancies code, explosives Requirements for Specific Equipment code Work in Excess of 600 V code Temporary Wiring code Electrical Safety During Excavation code Enclosed Electrical/Electronic Equipment R&D Unlisted Electrical Equipment Approval R&D Research and Development R&D Electrical Severity Measurement Tool A – DOE Model Electrical Safety Program B – Acronyms and Definitions code C – Unlisted Electrical Equipment - EFCO R&D D – Hazard Analysis - EFCOG R&D E – Referenced Citations code F – Severity Tool EFCOG

14 2018 Update Handbook revision approved by headquarters
Justified uniqueness of handbook (e.g., R&D) Contains material not found anywhere else Eliminated code repetition Reordered Handbook to include all material in main body Listed ideas for new sections

15 Consideration for Elimination
The next few slides look at each chapter for Elimination - Yellow Update - Blue Closer consideration – Green

16 Elimination criteria Material fully covered by existing code (e.g., NEC, NESC) ELIMINATE Material covered by existing code, but has unique challenges at DOE sites (e.g., maintenance, excavation) Revise and keep Material covered by existing code, but integrates with R&D material (e.g., AC hazard classification) Integrate and keep Material unique to handbook (e.g., equipment approval, hazard classification, etc.) KEEP - This is about 80% or more of the material

17 DOE Electrical Safety Handbook - 2018
Introduction general General Requirements general Hazard Analysis see Appendix D Electrical Preventive Maintenance code, challenges Grounding code, challenges Special Occupancies code, explosives Requirements for Specific Equipment code, challenges Work in Excess of 600 V code Temporary Wiring code Electrical Safety During Excavation code, challenges Enclosed Electrical/Electronic Equipment R&D Unlisted Electrical Equipment Approval see Appendix C Research and Development R&D References A – DOE Model Electrical Safety Program B – Acronyms and Definitions code C – Unlisted Electrical Equipment R&D D – Hazard Analysis R&D E – Referenced Citations code F – Severity Tool EFCOG

18 DOE Electrical Safety Handbook - 2018
Introduction general General Requirements general Hazard Analysis Electrical Preventive Maintenance code, challenges Grounding code, challenges Special Occupancies code, explosives Requirements for Specific Equipment code, challenges Electrical Safety During Excavation code, challenges Enclosed Electrical/Electronic Equipment R&D Unlisted Electrical Equipment Approval R&D Research and Development R&D References A – DOE Model Electrical Safety Program B – Acronyms and Definitions code and more C – Severity Tool EFCOG

19 1.0 Introduction 1.1 Purpose 1.2 Scope 1.3 Electrical Safety Program
1.4 Authority Having Jurisdiction update to current

20 2.0 General Requirements 2.1 Electrical Maintenance or Repairs
2.2 Basic Safeguards 2.3 Responsibilities 2.4 Modifications to Facilities 2.5 Approval of Electrical Equipment 2.6 Codes, Standards, and Regulations 2.7 Training and Qualifications of Qualified Workers 2.8 Working Space Around Electrical Equipment 2.9 Identification of Disconnecting Means 2.10 Work Instructions 2.11 Electrical Personal Protective Equipment 2.12 Work Practices

21 3.0 Hazard Analysis and Risk Assessment
Hazard analysis is a previous EFCOG product Risk assessment will be new

22 4.0 Electrical Preventative Maintenance some items will be eliminated
4.1 Development and Implementation Requirements 4.2 Electrical Preventive Maintenance Program 4.3 Maintenance 4.4 Inspection 4.5 Essential Elements 4.6 Planning and Developing an EPM Program, and Fundamentals of EPM 4.7 Ground-Fault Protection 4.8 Overcurrent Protective Devices

23 5.0 Grounding some items will be eliminated
5.1 Specifications and Drawings 5.2 Circuit and System Grounding 5.3 Equipment Grounding 5.4 Bonding 5.5 Grounded or Ungrounded Systems 5.6 Grounding Requirements 5.7 Grounding Electrode Conductor 5.8 Main Bonding Jumper 5.9 System with Grounded Conductor 5.10 Equipment Grounding Conductor 5.11 Ungrounded Systems 5.12 Grounding a Separately Derived System 5.13 Grounding Electrode System 5.14 Personnel Protective Grounds

24 6.0 Special Occupancies much of the material on hazardous locations will be eliminated
6.1 Explosives 6.2 Prevention of External Ignition and Explosion 6.3 Hazardous Locations 6.4 Electrical Equipment for Class I, II, and III Areas 6.5 Descriptions, Features, and Test Criteria of Enclosures for Hazardous (Classified) Locations 6.6 Underground Facilities

25 7.0 Requirements for Specific Equipment
7.1 Conveying Systems 7.2 Cranes and Hoists 7.3 Elevators and Escalators 7.4 Portable and Vehicle-Mounted Generators 7.5 Batteries

26 8.0 Work in Excess of 600 Volts 8.1 Responsibilities for Safety
8.2 Training 8.3 Job Briefings 8.4 Personal Protective Equipment and Protective Clothing 8.5 Protective Grounding of Lines and Equipment 8.6 Installing or Removing Conductors 8.7 Special Tools 8.8 Tree Trimming 8.9 Underground 8.10 Ferro-Resonance

27 9.0 Temporary Wiring 9.1 Requirements and Installation Conditions of use 9.2 Using Assured Equipment Grounding Conductor Program 9.3 Portable Electrical Tools and Equipment

28 Chapter 10 Electrical Safety During Excavation
10.1 General 10.2 Utilities Identification 10.3 Utilities Verification and Marking 10.4 Utilities Disposition 10.5 Work Control During Excavations 10.6 The Excavation Process 10.7 As-Built Drawings

29 Chapter 11 - Enclosed Electrical/Electronic Equipment
11.1 Grounding and Bonding 11.2 Rack Power Distribution 11.3 Chassis Power Distribution 11.4 Protective Devices for Enclosed Elect. Equipment 11.5 Disconnecting Means 11.6 Marking and Labeling Requirements 11.7 Working Clearances 11.8 Cable/Utility Management System 11.9 Electrical Safety Requirements for Tester Facilities 11.10 Enclosed Power Electronics 11.11 Non-ionizing Radiation 11.12 Ampacity Information for Wire Sizing

30 Chapter 12 – Approval of Unlisted Electrical Equipment
EFCOG Product

31 Chapter 13 Research and Development
13.1 Operation and Maintenance 13.2 Employee Qualifications 13.3 Generic R&D Equipment 13.4 Methods 13.5 Requirements for Specific R&D Equipment

32 Chapter 14 References ANSI ASME ASTM Crane DOE CFR IEEE ISA NEMA NFPA
UL Other

33 Ideas for New Material Lithium Ion batteries Solar Power systems
Emergency Response for electrical systems LOTO Lessons Learned Mixed hazard PPE Risk Assessment Tools, mobile app, etc.. Superconducting magnets Best practices (subsurface detection, LOTO) Lightning protection EFCOG working group products

34 Ideas for User tools Flow chart linked to sections
Mobile App for hazard classification and controls Mobile App for DOE handbook

35 Path Forward Recruit new working group members Assign sections
Revise sections Decide on new material Assign new material Consider EFCOG best practices and working group products Work will NOT wait on future Workshops, but will occur in real time.

36 2016 Working Group Members 2018 New Members
Mike Hicks, DOE INL Jeff Williams, DOE LANL Lloyd Gordon, LANL Tommy Martinez, LANL Tim Snow, NREL Richard Green, LLNL Don Bourcier, LANL Eugene Santiago, BNL John Lacenere, PPPL John Echave, LANL Eric Stromberg, LANL


Download ppt "DOE Electrical Safety Handbook"

Similar presentations


Ads by Google