LCLS Undulator Scope, Management, Organization
DOE Review of the LCLS Project February 7 - 9, 2006 Stephen Milton Argonne National Laboratory Advanced Photon Source
2
LCLS UNDULATOR SYSTEM 33 rf Beam Position Monitors
33 Beam Finder Wires Wire Position Monitor Hydro static level system Magnet Measurement Facility 33 Undulators 33 Quadrupoles/Correctors EM air-cooled 10 Long breaks 22 Short Breaks Supports with movers 5 DOF plus horizontal slider Vacuum System Al on SS (316LN) “Rectangular” Cross Section
3
SHORT BREAK / LONG BREAK
Descoped
4
Global Schedule and Integration Vacuum and Diagnostics
May 2005 Organization Undulator Physics H.D. Nuhn Undulator System System Manager S. Milton Chief Engineer G. Pile CF Physics J. Welch Global Schedule and Integration R. Boyce Project Support J. Alicz ES&H (ANL) T. Barz QA F. Clark PMCS (ANL) F. Coose Project Analyst J. Ingraffia Procurement P. Mast PMCS (SLAC) P.Styka Accounts SLAC Integration B. Youngman Controls System System Manager B. Dalesio System Layout TBD Magnetic Measurement R. Ruland Magnets and Supports M. White Vacuum and Diagnostics D. Walters Controls J. Stein
5
Jan. 2006 Organization Undulator System SLAC Project Support
H.D. Nuhn Und. Physics J. Welch CF Physics R.M. Boyce Global Schedule and Integration Controls Systems Manager B. Dalesio E-beam Systems Manager D. Schultz SLAC Und. Manager R. Pope Undulator System System Manager S. Milton Chief Engineer G. Pile Metrology C. LeCocq ANL LCLS Project Support R. Hislop ES&H (SLAC) T. Barz QA F. Clark PMCS (ANL) F. Coose Project Analyst J. Ingraffia Procurement P. Mast PMCS (SLAC) P.Styka Accounts Controls J. Stein Magnets and Supports M. White Vacuum and Diagnostics D. Walters
6
ES&H and QA
7
ES&H and QA Partial clip of the input form for specifying the ES&H and QA needs and oversite for all WBS elements.
8
Effort Management Online System Developed for the LCLS project
Yellow Sheet Agreement between ANL LCLS Project, Division Directors, and Group Leaders about access to a particular individual over a particular period of time and for an defined amount of effort Peach Sheet Generated from the Yellow Sheet Agreement between the CAM and the person requested to do the work Defines work and cost codes to charge to Green Sheet Weekly effort reports from the people doing the work Space provided for each assigned cost code and time spent on the work within that area Weekly reminders just added notification of CAM to approve once the individual has “closed” the sheet Reports Reports generated based on individual, cost code, or division
9
Example Yellow sheet
10
The main page that allows people working on the project to access their green sheets
11
An example filled out green sheet
An example filled out green sheet. These are done weekly by everyone working on the project.
12
Example Monthly Report for one person
Other reports are available that provide effort per cost code or within a single division.
13
Effort Management Comparison to the ANL system
ANL system uses estimates generated in the middle of the month by each individual This in turn is compiled by hand by a variety of people from secretaries to division HR This information is then passes on to the individual division offices, compiled again by hand and then entered into the ANL HR accounting system The LCLS uses approximately 50 cost codes and 4 ANL Divisions in 2 different ALDships Needless to say the above method, handled differently by different divisions, different individuals, and different ALDships leads inevitably to errors We developed our own completely electronic system to provide a cross check to the official ANL system and manage/control our accounting
14
Questions?