1 Highway Infrastructure Safety Inspections
The need for evolution…

2 The Old Code of Practice – the 2005 well maintained highways
Prescriptive Recommendations Specific Guidance DCC 2013 Safety Inspection Manual Based on 2005 Code of Practice Included a risk based element to defect assessment Potential for inconsistent approach

3 Existing Confirm System
Automatic response time associated with route inspection frequency Two further attributes; probability and impact Manually select low, medium and high priority for each Manually alter priority

4 The New Code of Practice – Well-managed Highway Infrastructure
Introduced in 2016 To be implemented by end October 2018 A risk based approach Non Prescriptive Down to us to decide what we do locally Evidence based approach Good process and practice Competency is key DCC 2018 HIAM Safety Inspection Manual Approved July 2018 Based on the New Code Risk Based approach to defect assessment Systemised Supports the decision of the inspector Full audit trail Enquiries need to be aligned to risk based process GO LIVE April 2019

5 New Risk Matrices – Carriageway & Footway

6 Defining Probability and Impact
Based on Network Hierarchy location Series of questions related to defect type each with a score Evidence based Provides audit trail and support for inspector decisions Consistency of approach Generates risk score which relates to defect response time in the risk matrix Inspector able to agree/disagree with output and amend if necessary with reason P1: Carriageway Hierarchy Location Hierarchy Resilient Network MH1 MH2 MH3 MH4 MH5 MH6 MH7 Score 8 7 6 5 4 3 2 1 P1: Footway Hierarchy Location Hierarchy 1 2 3 4 Score

7 Example Probability and Impact Questions

8 New Confirm System New carriageway/footway risk scores inputted
New defect codes with associated questions Risk score range is appended to defect response time Requires manual inspector calculation, both addition and multiplication