Background Established in 1976, by agreement of 8 local municipalities
Implementation of a regional solid waste disposal system to include a resource recovery operation, featuring a Refuse Derived Fuel (RDF) Plant and a Power Plant Operates 7 Transfer Stations Regional LF on 800 acre site in Suffolk
5
Recent History Service Agreement with Wheelabrator through January 31, 2019 Evaluating Proposals for Long term disposal options Use and Support Agreements with Communities executed in 2017 with initial term through June 30, 2027 Conditional Use Permit and Rezoning obtained from City of Suffolk for Cell VII Construction and Future Development
6
Operations System overseen by 16 member Board of Directors. 2 from each community Managing 400,000 tpy of solid waste for disposal through delivery to RDF or Regional Landfill Ash residue used for daily cover at Regional Landfill Managing Tires, HHW, Batteries, White Goods, Oil, Electronics from residents and businesses
7
Regional Landfill Closed Cells I - IV Cell VI Cell V Future Cell VII
8
02 Unusual Conditions
9
Accumulated Leachate Reported to VADEQ as Unusual Condition
Discovered in January 2017 Operational review of procedures > 30’ Depth in Cell V Confirmed with Measured Elevations in Cleanout Risers No apparent discharge from containment or environmental impact Reported to VADEQ as Unusual Condition NOV issued March 21, 2017 Consent Order Issued by DEQ June 1, 2017 Schedule of Compliance Civil Penalty
11
Accumulated Leachate > 30 Feet
12
Cell V Layout Sump 42 Acres
13
Sump Section
14
Cleanout Riser
15
Contributing Factors Aged System
On-Site Knowledge and System Understanding Few staff knew system operation and performance Lack of formal detailed system training NOVs from HRSD for > 50,000 GPD at COD Level Modified system operation in response
16
Contributing Factors Conservative to Avoid Overfilling Wet Well or Lagoon No system auto-shutoff SCADA System Inoperable Operating Area Frequent Pump Failure Inoperable Flow Meters
17
Corrective Actions Employed
03 Corrective Actions Employed
18
Initial Actions Repair/Replace Pump Station Components
Replaced Transducers and Flow Meters Focused Pumping from All Cell V Pump Stations Install Cellular High Level Alarms Sampling and Analysis of Leachate Determine Source of COD Coordination with VADEQ Bi-weekly status updates Developed Corrective Action Plan Coordination with HRSD
19
Cell V Side Riser Vault Upgrade
20
Cell V Responded Well to Focused Operations
21
Cell V Responded Well to Focused Operations
22
Cell VI Accumulated While Cell V Remedied
23
Success P&H of 100,000 to 150,000 gpd remedied accumulation
Temporary Loadout Station Hauled to 3 Different Discharge Locations Pumping max 50,000 gpd direct to WWTP Approximately 8M Gallons Excess Removed Quantity initially overestimated Faster than first feared Returned to Compliance in July 2017
24
04 Path Forward
25
SCADA PLC Based Pump Control Panels Human Machine Interface
10 Locations – All connected Alarm Interface and Auto Shutdown Pump Flow Rate and Totals Human Machine Interface Review Operations at all Locations Terminal Stations Operator and Engineer Level of Management Trending of Performance Data
26
Permanent Loadout Safe Loading and Offloading
Concrete Pad with Sump Two Quick Connect Locations Rear and Mid Truck Utilizing Existing Discharge Pumps VFDs to Turndown Control of Discharge Volume Automated Control Valves
27
Operational Changes Sequence Fill Plan Developed
Shed More Stormwater Reduce Active Area Incorporate Diversion Berms Review Pump Station Performance Flow Rates Sump Recharge
28
Proper Training Who Knows How System Operates Design Understanding
Succession planning Design Understanding Contractor On-Call Alarm Response/Know How Blinking transducer signal? Are pumps in auto or hand mode? Maintenance Records Hours of services on pumps
29
05 Lessons Learned
30
Recommendations Training Communication Coordination with DEQ
Track System Performance Integrate Alarms and Protection