1 REFORMA ESTADIO EL MOLINÓN
SPAIN REFORMA ESTADIO EL MOLINÓN GOEN AISLAMIENTOS

2 Project Details Building Type Building Size Project Dates Saint-Gobain
Stadium Building Size 568 m² Project Dates 07/2016 – 01/2017 Saint-Gobain Products & Systems Rigitone ceilings Habito Pasterboard 4PRO Plasterboard Ceramic Placostic

3 Reforma Estadio el Molinón, Gijón
Contractor Company Name Goen Aislamientos Main Representative Mr. Hector / Mr. David Gonzalez Encina Company Size 5 employees Specialised in Plasterboard Installation

4 Reforma Estadio el Molinón, Gijón
Building Owner Architect Contractor Innovation Partners Saint-Gobain Project Manager Real Sporting de Gijón José Ramón Fernandez Blanco Goen Aislamientos Name Name Sales team

5 Reforma Estadio el Molinón, Gijón
The project consists on a remodelling carried out in the Molinón Football Stadium in several of its spaces. ( new official store, press room, TV sets and changing rooms). Each of this spaces requires specific needs which have been solved with different PLACO® systems. Sample text (high level project pitch) STRANDBADKIRCHBICHL is a visionary design project involving the construction of a new office building in a remote mountain region of Austria, with a design which reflected the crashing waves coming in from the nearby beach. Great technical skill and knowledge of interior systems was required in order to optimize lighting, acoustics and sound absorption within a very complex curved shaped structure which would not naturally provide this level of performance. This presentation will also be used on the book and on the website to present your project.

6 Reforma Estadio el Molinón, Gijón

7 Reforma Estadio el Molinón, Gijón
TV sets have been solved with a good combination between our Rigitone® and Gyptone® ceilings. It has been used Rigitone® 8/18 model on walls and Gyptone® Big Line 6 model in ceilings. The result is rooms with good aesthetics qualities and acoustic comfort.

8 Reforma estadio el Molinón, Gijón
Press room has been solved with Habito Systems to hang the television monitors without problems.

9 Reforma estadio el Molinón, Gijón
In other ceilings has been used 4PRO plasterboard due to the importance of plasterboard finishing when it is exposed to indirect lights.

10 Reforma estadio el Molinón, Gijón
In other areas of the Molinón Stadium have been used moisture plasterboard due to the demands on wetness.

11 Reforma estadio el Molinón, Gijón
During the official store remodelling, it has been necessary to use ceramic Placostic® to cover the old surfaces with ceramic tiles.

12 Reforma Estadio el Molinón, Gijón
Key challenges . The use of different Placo® solutions in the same spaces and installed by same installer. Sample text Acoustics and light are the dominating elements in this project. The challenge was to allow maximal use of natural daylight using an unusually large funnel and integrating artificial lighting to complement natural light. The design however also had to provide an excellent level of acoustic performance in a challenging large open plan structure with high windowed ceilings. In addition to a combination of acoustics, sound absorption and light, there was particular emphasis on architecture and functionality through to the final finishing coating (Q4 surface quality) in order to meet the rigorous project standards.

13 Reforma Estadio el Molinón, Gijón
Main Saint-Gobain products and systems used Air quality and Aesthetic & acoustic insulation / Rigitone 8/18- High performance Press room Load capacity & impact resistant/ HABITO- High performance Good finishing & jointing resistant / 4PRO- High peformance Official store Finish quality & good adhesion / Ceramic Placostic – High performance Changing rooms Key achievements?

14 Reforma Estadio el Molinón, Gijón
Key achievements The use of Rigitone on walls as it is not a frequent solution. The use of the multiple Placo® solutions and the good combination between its. Sample text Project delivered to challenging budget and time schedule Discussion throughout the process with the architect to optimize each design phase. Final result combines high standards for design / aesthetics, acoustic comfort, and optimal levels of natural daylight.

15 REFORMA ESTADIO EL MOLINÓN
SPAIN REFORMA ESTADIO EL MOLINÓN Goen Aislamientos – José Ramón Fernandez Blanco José Manuel García Bailón Photography Credits: Name Surname