Presentation is loading. Please wait.

Presentation is loading. Please wait.

B-PACK Proposal.

Similar presentations


Presentation on theme: "B-PACK Proposal."— Presentation transcript:

1 B-PACK Proposal

2 Who we are Hooli is a medium/large company working in Italy offering IT solutions to companies that want to innovate and solve their tech problems. 150 employees with high skills and strong motivation Solid company with international partners Strongly innovative and creative Competitive prices The customer at the center

3 The raw material matter
Quality control The raw material matter The waste reaches the warehouse and are dropped off onto a conveyor belt When a part of the waste reach the sensor, a probe analyze the chemical composition If the product is good enough, the mechanical arm send it to the cool room otherwise to the incinerator

4 Don’t forget your product
Quality control Don’t forget your product The waste is stored in cold rooms and for each of them there is an air quality sensor that alert if the matter is going bad and identify uniquely the room. Each bin have a unique tag that identify uniquely the waste contained in the bin. These identifier are automatically scanned when a bin enter or exit from the cold room and these information are collected to build vendor ranking and check for products in inventory.

5 The production process
Quality control The production process During the cooking process a thermometer will send information to a central server that will monitor the temperature and automatically adjust the valve A probe analyze also the mixture composition and stop the stove when a particular customizable rule is satisfied On the beesvax tub there is another thermometer that do the same of the one with the mixture

6 Orders Management VENDOR RATING TRESHOLD ALERT AUTOMATIC REORDER
Track the quality of your supplier and get suggestions about who is more affordable and offer the best quality TRESHOLD ALERT Get useful warns each time the resources in the warehouse are weak AUTOMATIC REORDER Set the automatic reorder feature to order answer to warns ordering from your top supplier ANALYTICS Get useful statistics about the product wasting and request so you can understand better your future orders

7 Summary The raw materials are always tracked
Understand better The raw materials are always tracked The quality is checked at every step The managers can have real-time information about production and raw material status Production process can be totally controlled remotely Orders can be done automatically based on the inventory stock

8 How will we work? Warehouse Control System
We created 2 customized team to face your problems and we will work together with an external company to provide all the needed sensors. Warehouse Control System 2 Software Developers, 1 Embedded Engineer, 1 IT Technician Production Management System 2 Software Developers, 1 Embedded Engineer, UI Designer

9 How much and when? Delivery Date Total Cost Extended Support
17 July – 35 Days Total Cost Including Software Development, Design, Tutoring, External Company payment and 6 months of support and server management Extended Support Extended Support Including support and server management for 5 years Including support and server management 7.750 € / month 5200 € / month

10 THANK YOU Any question? Marketing Manager Operational Manager
Supply Chain Manager Financial Manager Davide Coccomini Gabriele Martino Maurizio Pulizzi Nicola Mota


Download ppt "B-PACK Proposal."

Similar presentations


Ads by Google