Download presentation
Presentation is loading. Please wait.
Published byGodwin Steven Short Modified over 5 years ago
1
DOE-EFCOG ISM & QA Spring 2017 Strategic Planning & Direction
Mike Hassell Vince Grosso
2
Agenda Welcome and Introductions Spring Meeting Focus
DOE ISMS/QA Priorities Best Practices Discussion Working Group Breakout Session Overview: Contractor Assurance System Safety Culture/HRO Human Performance Improvement Work Planning and Control Supply Chain QA Policy & Procedures Software Quality Assurance Recap of discussion and path forward
3
Contractor Assurance System
Patricia Allen Darlene Murdoch
4
Contractor Assurance System
CAS – Effective Issues Management Core Elements – On Hold CAS – CAS Element Survey – Still Open? CAS – CAS Maturity Evaluation Tool Finalize and Approve Review the CAS Effectiveness Validation BP Work on LOI development
5
Cindy Caldwell Rick Hartley
Safety Culture/ HRO Cindy Caldwell Rick Hartley
6
Safety Culture/HRO Safety/HRO Guide to Monitoring and Improving Safety Culture Goal to finalize for review and issuance. Safety/HRO Establish a comprehensive information exchange site Safety Culture Good Practices WTP WRPS BEA/INL ORAU
7
Human Performance Improvement
Chuck Ramsey Greg Weatherby
8
Human Performance Improvement
HPI DOE & Contractor Leadership Guidance 01B – Effective Coaching – final draft reviewed – to be group reviewed and finalized HPI – HPI Best Practices that Ensure Quality V&V of Procedures and Guidance
9
Human Performance Improvement
LANL HPI Simulator Direction of HPI in DOE and INPO Contract update DOE HPI Lead Training Initiative with DOE Training Initiative (DTI) Risk-Based Thinking about Human and Organizational Performance Managing Risk at Critical Steps Operational Leadership - How HPI Fits into the Big Picture WORLD CAFÉ: Challenges of DOE Ownership of Human Performance Competency
10
Work Planning and Control
Fred Berl Rick Runnels
11
Work Planning and Control
WM – Assist Visits for Implementing DOE Handbook – Debrief Sandia Visit Metrics for Work Planning & Control HPI Simulator Tour Graded Approach – threshold for WP&C processes Sub-Contractor WP&C Safety Basis relationship with WP&C
12
Quality Assurance Open Tasks
Vince Grosso
13
EFCOG Supply Chain Quality Task Team Status Apr 25, 2016
Vince Grosso Quality Assurance Technical Team Chair William Wingfield Supply Chain Quality Task Team Chair Joseph Fulghum Supply Chain Quality Task Team Vice Chair Cynthia Williams Supply Chain Quality Secretary
14
Supply Chain Quality Tasks
SC – Packaging SC – CGD Handbook Training SC – CGD Handbook SC MASL User Guide Update SC MASL Import/Export SC – MASL Cost Avoidance SC & SC still open?
15
Supply Chain Topics Team with P&P for several topics
MASL demonstrations NAP-23 Export Control Implementation Impact DOE O 460.1D Haz Mat P&T NQA Committee Activities DOE IG Audit of Hanford
16
EFCOG QA Policy and Procedures Task Team Status
Vince Grosso
17
QA Policy and Procedures
P&P-16-01, Guide for Large Scale Procurements in 413.3B Projects Work task with closure planned 2017. P&P-11-02, Graded Approach Discuss/resolve comments with intent of finalizing by 6/30/2017 Procurement Engineering Benchmarking Legacy Spare Parts S/CI Training Engineering Software Toolbox Importance of Signatures
18
Software QA Task Team Status
Vicki Pope Mike Lackner
19
Software QA SQA-16-01 – Audit Survey Task
SQA – Website Task Update SQA – SMACS Clarification Task Knowledge Capture – SQA Training Firmware Whitepaper Tool Demo: LANL’s Source Tracker
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.