1 LITGRID AB Implementation of EU Connection Network Codes
2017

2 Interinstitutional NC WG in Lithuania
Main scope: exchange information about the Network Codes implementation at national level; make recommendations to decision-makers and to network codes implementing bodies; create action plan for stakeholders coordination and provide necessary resources for implementation actions; align positions of the network codes transfer into national law. DSO LITGRID Ministry of Energy Regulator Energy Inspectorate

3 NC implementation project in Litgrid
Supervisory committee PM/lawyer Redvita Četkauskienę RfG Romas Pangonis DCC Audrius Baranauskas HVDC Paulius Cicėnas CACM Aistė Krasauskienė FCA Andrius Šimkevičius BC Donatas Matelionis SO Giedrius Radvila ER CNC Market System

4 GENERAL CNC IMPLEMENTATION PLAN
2017 2018 2019 Q3 Q4 Q1 Q2 RfG NC (EU) 2016/631 entry info force 17/05/2016 Definition of requirements at national level and coordination with adjacent TSO Public consultation NRA approval National law amendment DCC NC (EU) 2016/1388 entry ` HVDC NC (EU) 2016/1447 entry info force 28/09/2016

5 Connection Network Codes (CNC) Baltic working group
Tomas Šumskas Romas Pangonis Audrius Baranauskas Paulius Cicėnas Rimantas Redecki Didzic Sulcs Jako Kilter Mart Landsberg Karin Taar Andrus Reinson Scope of this working group is to form unified understanding on implementing European Connection Network Codes in Baltic States. Working group should find common basis for Synchronous zone base requirements, but also it is recommended to have similar approach to defining other selectable parameters according to NCs. This will be helpful to justify the requirements for all stakeholders in similar basis and lay a foundation smooth approval of the new NCs. If seen necessary common network studies in order to justify the parameter selection should be made together or outsourced.

6 Connection Network Codes (CNC) TSO-DSO working group
Redvita Četkauskienė Romas Pangonis Audrius Baranauskas Paulius Cicėnas Rimantas Redecki Virginijus Radžiukynas The main task of common Transmission System Operator and Distribution Network Operator working group is to define European Connection Network Codes requirements in Lithuania. In common cooperation this working group shall define requirements for connection to distribution network <110 kV and for connection to high voltage >110 kV network, and to set TSO/DSO interface requirements.