Download presentation
Presentation is loading. Please wait.
Published byAidan Teddy Modified over 10 years ago
1
Office Post-Processing
2
Download Note: Static observation data are only stored in the receiver and hence receiver is required to be connected to the PC for downloading.
3
Topcon Tools If you are running on demo mode the following will popup If you are not running on demo mode the following will popup Note: If you receive Sentinel protection driver not installed it means the driver for the USB needs to be installed first.
4
Topcon Tools – New Job Click here Enter name Enter here Click here
5
Topcon Tools – Configuring Click here Enter the observation precision for you project
6
Topcon Tools – New Datum Click here
7
Topcon Tools – New Datum Click here Check with your local authority for the value
8
Topcon Tools – New Projection Click here Select your custom datum Click here
9
Topcon Tools – New Projection Click Here Check with your local authority for the value
10
Topcon Tools – New Projection Scroll this Select your custom projection
11
Topcon Tools – New Projection Click Here
12
Topcon Tools - Configuring Click Here
13
Topcon Tools - Configuring Click Here
14
Topcon Tools – Import Data Click here
15
Topcon Tools – Import Data Select this Automatic search for GPS+ receivers Note: For GRS-1 it will be Mobile device
16
Topcon Tools – Import Data Select your receiver Click HereClick here
17
Topcon Tools – Control point Click here and select what type of control point you want it to be If you are using an auto pos for coordinate you require to key in the actual coordinate The icon will change to triangle to show that it is a control point
18
Topcon Tools – Antenna Info Select this
19
Topcon Tools – Antenna Info Click here Enter all antenna type and height
20
Topcon Tools – PostProcessing Click here
21
Topcon Tools - Adjustment Green = Post-Processing Passed!!! Click here Red = Post-Processing Failed!!! Baseline: Tips: Make sure all baselines have passed post-processing before adjustment!!!
22
Topcon Tools - Adjustment Click here
23
Topcon Tools - Adjustment PASSED!!!
24
Topcon Tools - Options Right - Click Click here
25
Topcon Tools - Options Click here
26
Topcon Tools - Adjustment
27
Topcon Tools – Report Click Here
28
Topcon Tools – Report Click Here
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.