Presentation is loading. Please wait.

Presentation is loading. Please wait.

EA Deliverable Equipment for East Area Renovation

Similar presentations


Presentation on theme: "EA Deliverable Equipment for East Area Renovation"— Presentation transcript:

1 EA Deliverable Equipment for East Area Renovation
Giulia/Aboubakr

2 Cerenkov Counters - XCET
2 on T09 2 on T10 3D design on going Meeting done to check the current situation  document on overview XCET to be circulated soon EAST AREA: 4 XCET to be produced 4 bodies with supports already available Windows to be defined Procurement of mirrows? (recover the existing ones?) Control Panel to be done (3D model to be finished) Complete assembly with body chambers and windows to be assembled and welded by certified welder Pressure test from HSE to be done RESPONSIBLES? Design: Production: Assembly: 7 May 2019 EA Equipment Review

3 Collimators and XTCX TCX: 3D design ready, drawings to be done Bard??
Fixed collimator 1 on T09 3D design done, 2D drawings on going (Bard) HTCAA Support XTCX 1 XCSV Collimator 2 blocs Vertical 2 on T10 1 on T11 On stock XCHV Collimator 4 blocks 3 on T09 1 on T10 ? UNI Supports Collimators 7 To be checked in stock TCX: 3D design ready, drawings to be done Bard?? Production with external company Collimator 2 blocks: on stock Collimator 4 blocks: on stock? renovation complete to be done (change motor, screws, bearing…..) RESPONSIBLES? Design: Production: Assembly: 7 May 2019 EA Equipment Review

4 XCON and XSCI XCON Absorber/converter 2 on T09 1 on T10 3D model and technical spec to be done XSCI Scintillator 2 on T09 (XSCI) 1 on T10 (XSCI) 1 on T11 (XSCI) from BI HLGAC Support absorber/converter (MAUVE) 7 4 recovered from T09 and T10 3 on stock XCON: 3D design to be done following interaction with physicists to decide a proper material and thickness Technical specification to be done Control SMM Quantité de XSCI à installer sur chaque lignes ? T9 : 2, T10 : 1 ou 2 ? T11 : 1 RESPONSIBLES? Design: Production: Assembly: 7 May 2019 EA Equipment Review

5 Wire and Ionization Chambers
XWCM Multi wire proportional chamber 1 on T08 installed HXWCM Support XWCM XION Ionization Chamber Installed HXION Support XION Already installed, no modifications Name to be inserted in the naming portal and then registerd on layout database Gas supply for XWCM on T08 to be redone Second XION to be installed in T08? 7 May 2019 EA Equipment Review

6 Beam Profile Monitors - XBPF
BXBPF Beam profile monitor for experimental areas (VESSEL) 2 on T09 1 on T10 1 on T11 3D design on going UNI Support BXBPF 4 To be checked in stock? 3D model ready 2D drawigns ready Production 4 vessels to be done with external company Assembly chez nous 2 windows + 2 flanges for device to be procured? (EA-VIDE) Inteface with adjusting base to be produced (angle regulation) RESPONSIBLES? Design: Vincent Production: Assembly: 7 May 2019 EA Equipment Review

7 Supports Recoverd as they are (stocked @ CHARM), ready to be installed
? Support BTV 5 Recovered ready for installation HBCTB Support beam current transformer BCTF 1 on F61 HBLSD Support Spill mesurement LSD HXSEC Support XSEC 1 on F62 1 on F63 2 on T08 Recoverd as they are CHARM), ready to be installed Name to be inserted in the naming portal and then registerd on layout database (BTV names to be checked) BCT recovered from linac 2 (BI resposible) On F62 BTV support name PSZBTVMC0028 LSD vacuum chamber to be cheked! 7 May 2019 EA Equipment Review

8 Open Points 7 May 2019 EA Equipment Review
From: Erwan Harrouch Sent: mardi 30 avril :49 To: Sebastien Evrard Johannes Bernhard Michael Lazzaroni Cc: Giulia Romagnoli Subject: FW: Resources for urgent actions: BLMs Bonjour à tous, Lors de la revue du TDR avec Jocelyn, deux points en suspens ont été levé : Quantité de BLM à installer : Est-ce que les télescopes sur la cibles seront effectivement remplacés par des BLMs ? Est-ce que les BLMs sur les lignes primaires seront installés ?(Cf. mail ci-dessous) Quantité de XSCI à installer sur chaque lignes ? T9 : 2, T10 : 1 ou 2 ? T11 : 1 Merci Erwan 7 May 2019 EA Equipment Review

9 Thank you!