Download presentation
Presentation is loading. Please wait.
Published byElli Juusonen Modified over 5 years ago
1
Liaison from 802.15 to 802.18 Date: 14 Sept 2017 Sept 2017 Name
Affiliation Address Phone Jay Holcomb, Vice-Chair Itron, Inc. 2111 N. Molter Liberty Lake, WA 99019 Notice: This document has been prepared to assist IEEE It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Jay Holcomb, Itron, Inc.
2
Sept 2017 Overview This document summarizes the activities of the IEEE Working Group for IEEE RR-TAG during the September 2017 IEEE 802 Interim Meeting at the Waikoloa Hilton, Kona, HI, USA. Jay Holcomb, Itron, Inc.
3
Task Group Status (1/2) Sept 2017 Task Group Closing Reports:
CLOSING REPORT: TG3d 100G THZ - KURNER done, not meeting CLOSING REPORT: TG3f 60GE (60GHZ EXTENSION) - ROLFE /0559r00 CLOSING REPORT: TG4s SRU (SPECTRUM RESOURCE UTILIZATION) - YOKOTA /0544r00 CLOSING REPORT: TG7m (7r1) OWC (OPTICAL WIRELESS COMMS) - JANG /0561 r00 CLOSING REPORT: TG8 PAC (PEER AWARE COMMUNICATIONS) - LEE /0531r01 CLOSING REPORT: TG12 ULI (UPPER LAYER INTERFACE) KINNEY / 0508r01 CLOSING REPORT: TG13 MGOWC (MULTI-GIGBIT OWC) JUNGNICKEL 15-17/0562r00 Jay Holcomb, Itron, Inc.
4
Study & Interest Group Status
Sept 2017 Study & Interest Group Status SGs CLOSING REPORT: SG 4md 15.4 REVISIONS KINNEY not found IGs CLOSING REPORT: IG DEP (DEPENDABILITY - KOHNO not meeting CLOSING REPORT: IG HRRC (HIGH RATE RAIL) - KIM not meeting CLOSING REPORT: IG LPWA (low power wide area) - ROBERT /0558r00 CLOSING REPORT: IG THZ - KURNER not meeting CLOSING REPORT: IG VAT (VEH. ASSIT TECH.) - JANG /0560r00 SCs CLOSING REPORT: IETF/RULES/SC-M - KINNEY /0409r02 CLOSING REPORT: WNG - KINNEY “ (same as above) Jay Holcomb, Itron, Inc.
5
Other Group Status Sept 2017 Liaison Reports
LIAISON REPORT - no report LIAISON REPORT - Holcomb /0536r00 LIAISON REPORT - Rolf verbal Jay Holcomb, Itron, Inc.
6
802.15 Meeting Close The 802.15 WG adjourned Thursday evening
Sept 2017 Meeting Close The WG adjourned Thursday evening The next face to face meeting of the WG will be the Plenary 05 – 09 November 2017 at the Caribe Royale Hotel Orlando, FL, USA Jay Holcomb, Itron, Inc.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.