1 Royal Oak to Bloomfield
Concept for a Rail-with-Trail through S.E. Oakland County 9/16/2019 R.O. to Bloomfield

2 History Railroad was built between 1836 & 48
Initially along the East side of Woodward 1925: Wider Woodward Ave. Group Dream of making Woodward a broad Blvd. State made a deal with the GTWRR Traded corridor of Land about 1 mile East for the R.O.W. along Woodward Very controversial project 9/16/2019 R.O. to Bloomfield

3 Original Concept Four parallel rails: (2 freight; 2 passenger)
Plus Aerial super speedway for autos The Birmingham Station was built Project never got beyond two parallel tracks shared by freight and commuter service 9/16/2019 R.O. to Bloomfield

4 Original Concept - 2 Did have commuter parking & platforms:
14 Mile Rd. Charing Cross Long Lake 18 Grade Separated Vehicle Crossings in 9.3 miles Project terminated prematurely by the Great Depression 9/16/2019 R.O. to Bloomfield

5 Trail Specifications Trail Head (S.E.): Royal Oak Amtrak 11 Mile
Trail Head (N.W.): Opdyke & Kensington Rds Length: Miles Owned by: Canadian National Railroad Terrain: Flat from 11Mile to Maple Significant ‘Cut & Fill’ n. of Maple 9/16/2019 R.O. to Bloomfield

6 Railroad Overpass Specifications
Number eleven (11) Width: 55 feet Used by Rail: 31 feet Available for Trail: 24 feet 3 foot concrete railing on ides All North of 14 Mile also have chain link fence on top of concrete 9/16/2019 R.O. to Bloomfield

7 Features / Benefits No interaction with motor vehicles in entire 9.3 mile extent of route. Many convenient Access points Services the most densely part of Oakland County A Linear Park interconnecting traditional Parks and other linear parks in Oakland Cty 9/16/2019 R.O. to Bloomfield

8 Features / Benefits (cont.)
9/16/2019 R.O. to Bloomfield

9 Acquisition of R.O.W. Propose Lease from Canadian National 9/16/2019
R.O. to Bloomfield

10 Benefits to Canadian National
Liability might be assumed by the Trail Organizatiom Trespassing Reduced Fence between Trail and Rails Legitimize existing casual use that has existed for year 9/16/2019 R.O. to Bloomfield

11 Rail Concerns (Potential)
Trespassing Liability Safety Train derailments People hi by trains 9/16/2019 R.O. to Bloomfield

12 Communities Affected Community Distance Royal Oak 3.78 miles
Birmingham 2.44 miles Bloomfield Twnshp 1.45 miles Bloomfield Hills 1.67 miles Total 9.34 miles 9/16/2019 R.O. to Bloomfield

13 Population Density (Potential Users)
Based on April 2000 Census data (SEMCOG Web-Site) Eleven Communities along Woodward Ave. Estimated population w/in 2 miles of trail: 118,000 (10% of Oakland Cty Residents) 12,650 people per mile 9/16/2019 R.O. to Bloomfield

14 Potential Uses Quick travel between Royal Oak and Birmingham
Artery to reach linked trails in northern Oakland County Short cut between localized street trails Exercise – walking and biking 9/16/2019 R.O. to Bloomfield

15 Access Points – Royal Oak
Royal Oak Amtrak Station Meininger Park (Royal Oak) Overpasses at: Greenleaf Dr. Benjamin St Normandy Several other convenient spots 9/16/2019 R.O. to Bloomfield

16 Access Points - Birmingham
New Condo Complex adj. To Amtrak Sta. Birmingham Amtrak Station Derby Middle School Manor Park (Birmingham) 9/16/2019 R.O. to Bloomfield

17 Access Points – Bloomfield Hills
Charing Cross Rd, Commuter Platform Office complex on Bloomfield Hills Pkwy Stonycroft Golf Course parking lot OCC Admin. Office – Opdyke Rd. Opdyke & Kensington Intersection – N.W. Trail Head 9/16/2019 R.O. to Bloomfield

18 Points of Interest – Royal Oak
Heart of downtown Royal Oak Royal Oak Dondero High School Meininger Park Normandy oaks Golf Course Royal Oak Country Club 9/16/2019 R.O. to Bloomfield

19 Points of Interest - Birmingham
Clover Hill Cemetery Big Rock Restaurant (old Birmingham Depot 1930) Downtown Birmingham - 2 miles Derby Middle School Manor Park Georgian Bloomfield Nursing Home Springdale Golf course Rouge River 9/16/2019 R.O. to Bloomfield

20 Points of Interest – Bloomfield Hills
Charing Cross Commuter Parking / Platform Trowbridge Rd. Vehicle Overpass Bloomfield Hill Parkway Office complex Bloomfield Open Hunt Club Stonycroft Golf Course OCC Administrative Offices St. Hugo Catholic Church and School 9/16/2019 R.O. to Bloomfield

21 Present Shared Commercial Uses
Service Road for Railroad Detroit Edison Power Lines Cellular Phone antennas & shelters AT&T Transcontinental Comm. Cable US SPRINT fiber optic cable 9/16/2019 R.O. to Bloomfield

22 Case Studies (Rails with Trails)
“Design, Management & Operation of Trails Along Active Railroads” by: Rails with Trails Conservancy, Nov. 2000 61 Case studies documented in Detail Three (3) in Michigan The Railroad Trail, Fredrick to Gaylord TART, Traverse City to Acme Gallup Park Trail, Ann Arbor 9/16/2019 R.O. to Bloomfield

23 Gallup Park Trail Ann Arbor, MI
Length of Trail 3.0 Miles Distance from Tracks 10 ft. (varies) Barrier 5 ft. Chain Link Fence Owner of RR Corridor Norfolk Southern Trains per Day 8 Train Speed 60 mph Uses Walk, bike, r-blade, and x-country skiing 9/16/2019 R.O. to Bloomfield

24 Gallup Park Trail Ann Arbor, MI (cont.)
Accidents None Maintenance $1,000/mile/year Acquisition Lease $1,000/year Funding Local Park Bond monies, MNR Trust Fund 9/16/2019 R.O. to Bloomfield

25 Development Required Surface - graded and coated
Fencing between rails and trail User Access points improved Service Vehicle access points Protective Fencing on all over passes from 14 mile South Signage 9/16/2019 R.O. to Bloomfield

26 Next Steps Contact the Canadian Northern to explore the feasibility of Leasing 9.3 miles of their right of way 9/16/2019 R.O. to Bloomfield


Download ppt "Royal Oak to Bloomfield"