Download presentation
Presentation is loading. Please wait.
Published by当 曹 Modified over 5 years ago
1
WG A Ecological Status Intercalibration: Where do we go from here ?
SCG meeting 22 March 2012
2
Intercalibration : Different situations
IC completed – all countries, Annex 1 IC completed – not all countries, Annex 1 IC not completed IC completed, Annex 2 SCG meeting 22 March 2013
3
Different situations in GIGs
Intercalibration : Different situations in GIGs IC completed – all countries, Annex 1 IC completed – not all countries, Annex 1 IC not completed IC completed, Annex 2 SCG meeting 22 March 2013
4
Situation 1 – What to do ? IC completed – all countries, Annex 1
E.g., Lake Alpine, Central-Baltic, Northern Macrophytes To translate the IC results to the national classification systems “Guidelines to translate the intercalibration results into the national classification systems and to derive reference conditions” SCG meeting 22 March 2013
5
Situation 2 – What to do ? IC completed – not all countries, Annex 1
E.g., Lake Alpine Phytoplankton – FR missing MS responsibility to intercalibrate the method according to the IC results How – will be discussed at April ECOSTAT The main role – MS which wants to intercalibrate SCG meeting 22 March 2013
6
Situation 3 – What to do ? IC not completed
E.g., Lake Central Baltic Fish - no results MS responsibility to reactivate the GIG work To submit the methods and carry out the IC Results by 2016 SCG meeting 22 March 2013
7
Situation 4 – What to do ? IC completed, Annex 2 IC partially achieved
E.g., Baltic Sea Phytoplankton GIG: BC1 and BC9 IC partially achieved MS responsibility to reactivate the GIG work To complete all the necessary steps Results by 2016 SCG meeting 22 March 2013
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.