Download presentation
Presentation is loading. Please wait.
1
JLEIC Accelerator R&D Meeting
Site Development – R. Sprouse/D. Fazenbaker January 26, 2017
2
JLEIC Site Development Scope
Engineering Services Contract – Indefinite Delivery Indefinite Quantity (IDIQ) Site Characterization & Early Project Development for conventional facilities Awarded in September 2015, Commonwealth of Virginia funds Scope includes all potential needs up to the start of design (CD-1) Site Development - $1,000K: Site plan with roads, parking, and structures Utility services & distribution Traffic Study Alternative analysis & feasibility studies Project Planning - $1,000K: Budgetary cost estimate Preliminary risk assessment Schedule development Pre-conceptual design report Design requirements document Site Condition Surveys - $500K: Topographic land surveys Property surveys Geotechnical investigation - soil borings Groundwater studies Environmental Services - $1,200K: Environmental site assessments Wetland delineation Environmental documents Ecological surveys Stormwater management plan
3
JLEIC Site Development Progress
Task Orders Completed #1 – Site Survey & ESA #2 – Tunneling Feasibility Study #4 – Utility Distribution Study #5 – Stormwater Management Plan Task Orders In Progress #3 – Program Management (ongoing) #6 – Environmental Studies Task Orders in Development Foundation Analysis & Vibration Studies Develop Building & Tunnel Cross Sections Task Orders in Future Update Site Plans and Utility Distribution Construction Schedule Update Cost Estimate Risk Assessment Pre-Conceptual Design Report JLEIC Rebaseline / Optimization Data Needed
4
JLEIC Site Plan – 2017
5
JLEIC Utilities Distribution
Chilled Water Communications Cryogenic Casing LCW Power Sanitary Sewer Water
6
JLEIC Stormwater Management
7
JLEIC Optimization Data Needed
Updated element survey file with respect to existing CEBAF machine on JLAB coordinate system Existing site plan based on 2,154m collider ring – is this still correct? Confirm electron & ion transfer lines can be constructed based on placement of large figure-8 as indicated on site plan Additional data required to design cross sections & confirm utility requirements Floor elevations for tunnel and detector halls Magnet selections for electron & ion rings Existing utility requirements assumed PEP-II magnets for electron ring Confirm He Cooler (ERL) dimensions & utility requirements
8
Questions?
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.