Contingency Plan for the March/April, 2006 possible power shortage

Similar presentations


Presentation on theme: "Contingency Plan for the March/April, 2006 possible power shortage"— Presentation transcript:

1 Contingency Plan for the March/April, 2006 possible power shortage
Period of Koeberg refuelling

2 Overview City Mun SDA ME Metro RED Transfer & Operating Agreement
Control over Full CCT geographic area and all customers Transfer & Operating Agreement Transfer & Operating Agreement Eskom Portion within Metro Area City Electricity Business 9/6/2019

3 Overview Koeberg Nuclear Power Station situation
Unit 1 out of service due to incident Unit 2 due for refuelling Units provide 900 MW each Above scenario implies possible power shortage and the need for this proposed contingency plan Joint workgroup (RED1, City, Eskom) 9/6/2019

4 Contingency Proposals
Three prong approach Electricity Supply Issues Infrastructure Availability Customer Relationship Management 9/6/2019

5 Electricity Supply Determine exact amount of shortage
Apportion shortage between Eskom & City Establish critical customers Prepare plan to rotate outage per area Actively target non-critical electrical loads Exchange experienced system operators between Eskom and RED1 network control centres 9/6/2019

6 Cape Town embedded generation
SHPS – 180 MW (available, non-continuous) RGT – 40 MW (available) AGT – 36 MW (available May) APS – 120 MW (not available) DWP – MW (IPP, not available) 9/6/2019

7 Summer load profile 9/6/2019

8 Infrastructure Availability
Determine serviceability of High Voltage Equipment Cease all scheduled maintenance Postpone routine maintenance on medium voltage apparatus (repairs driven) Postpone new connections where possible Redeploy staff to effect a more speedy response to equipment failure Discontinue normal demand side processes, hot water cylinder control & peak clipping 9/6/2019

9 Short term – CBD Reinforcement
~ GT 9/6/2019

10 Medium term – CBD Reinforcement
9/6/2019

11 Customer Relationship
Extensive media announcements Assist critical complexes to check the serviceability of standby plant Allow Eskom Aggregator to negotiate directly with the City’s large customers Prepare strategy to minimise impact of power cuts on all customers 9/6/2019