Download presentation
Presentation is loading. Please wait.
1
Senior Project SR-60/Theodore St.
Pre-Meeting Updates January 23,2015
2
Presentation Topic Brief description
3
The project must accommodate for future traffic growth due to Moreno Valley development and the increase in trucks from the World Logistics Center. It also needs to accommodate for the movement of trucks and an increase in pedestrian, equestrian, and bike traffic. The objective of this project is to improve the intersections’ projected level of service while considering environmental and socioeconomic impacts. May require more than one slide Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section 7
4
Geometrics Finalizing the changes from Caltrans (horizontals)
Traffic issues/tweaks volume-capacity ratio greater than 1 okay? Verticals on Theodore started May require more than one slide Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section 7
5
Traffic ICE Synchro 3-D for the big TVs Correcting LOS with PCE
Learning Vissim May require more than one slide Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section 7
6
Environmental/Water Resources
No Culvert – existing drainage Topo Shows water flows around site The real PEAR May require more than one slide Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section 7
7
Digital Mapping Allocating resources appropriately
Scan at end of quarter? Maybe scan in 2 weeks? SketchUp Pro May require more than one slide Section 1 Section 2 Section 3 Section 4 Section 5 Section 6 Section 7
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.