5 Total Capacity: 18 *770 MW=13860MW= 13.96 GW
Xiluodu Hydropower station, was located on the Jinsha river, a border area between Yunnan Province and Sichuan Province. The construction was started in 2005, the river was dammed in The power station was put online in 2013. Left bank: 9 unit /Right bank: 9 units, with the capacity of each unit being 770MW Total Capacity: 18 *770 MW=13860MW= GW Xiangjia Dam Hydropower station was located on the downstream stretch of Jinsha river, 160km away from Xiluodu hydropower station. Left bank: 4 unit /Right bank: 4 units, with the capacity of each unit being 800MW there are 3 additional units with the single capacity of 450MW Total Capacity: 8 *800 MW + 3*450MW =7750MW= 7.75 GW

6 Xiluodu Hydropower station

7 Xiluodu Hydropower station