Download presentation
Presentation is loading. Please wait.
1
BES III Software: Short-term Plan (2005.6 - 2005.10)
Weidong Li 14th June 2005
2
To-do List (1) Analysis software development
Particle identification Vertex finding Calibration algorithms and detector alignment services Trigger simulation Event filter software and testbed Geometry services migrate to new detector description More realistic detector simulation Backgrounds Digitization Raw data production 29 May 2005 Weidong LI
3
To-do List (2) Event display Reconstruction algorithms
Root event input MDC TOF EMC MUC hits Reconstructed tracks or clusters Reconstruction algorithms Move to latest release 4.2 performance tuning Performance studies Efficiency and resolution Algorithms’ benchmarking and profiling Any memory leakage Another design iteration for EDM Documents 29 May 2005 Weidong LI
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.