MSD I Review February 22, 2008 (9:00 AM) Room 09-2550.

Similar presentations


Presentation on theme: "MSD I Review February 22, 2008 (9:00 AM) Room 09-2550."— Presentation transcript:

1 MSD I Review February 22, 2008 (9:00 AM) Room

2 Relationships of Sub-functions
3 2 4 Create a functional interface to log and trend data Safely install compressor 1 dfgsdfg 1 – Installation and interface relate via the installation of a suitable computer workstation 2 – Interface and revamp relate through the documents both sub functions will produce for future teams to use 3 – Revamp and installation are related through the creation of a safe environment suitable for the revamp of the compressor 4 – All sub-functions work together to provide a safe, solid, and functional foundation for future teams to pursue further revamp and fault detection projects

3 High Level Customer Needs and Engineering Specs
Safety Considerations Equipment List Trainings 70-95°F Maintenance Capabilities 24”-35” Access Space 30-45 ft2 Storage Space Tooling List < 40 lbs. Manual Lifting lbs. Assisted Lifting Installation of Compressor 8-19 Weeks from 12/3/07 Acoustic Levels dB Vibrations g/s 0 injuries Room Structural Load =15,000 lbs (nf = 2.0) Compressor Revamp 6 to 2 Stages hp 100+/-10 psi A Future Use Considerations Modifiable Interface Modifiable DAQ Variables Timeline for Projects Allowances for Projects Dresser-Rand Involvement Weekly Teleconference Meetings Bi-weekly Reviews Operation and Maintenance: Student Manual

4 High Risk Assessment Mitigated Remaining
Sound (D-R Data, Dissipation Experiment) Vibration (Spring-Action Damping Mounts) Budget (Coordination between D-R and RIT) Remaining Structural Load (Consultant Lead Time) Formula SAE Team (Exit Test Cell )

5 Student Version Operation and Maintenance Manual
Auxiliary Document, attached to the N30NL-4 “Maintenance Manual” Starting Guide for Future Project Teams Safety Considerations Procedures Engineering Details

6 Overall Projects Timeline

7 Senior Design II Timeline