Presentation is loading. Please wait.

Presentation is loading. Please wait.

Utgangspunkt for PowerPoint presentasjoner

Similar presentations


Presentation on theme: "Utgangspunkt for PowerPoint presentasjoner"— Presentation transcript:

1 Utgangspunkt for PowerPoint presentasjoner
Omega Utgangspunkt for PowerPoint presentasjoner

2 Quantity Management (QMS)
Designed for Company / Client verification of contractors measurement

3 Introduction Currently the Quantity Mgmt module contains two sub modules Contract Evaluation Measurement Verification Sutable for time and material contracts Price elements for man-hour norm and material unit rate (Compensation Codes) Quantity * Norms and Rates = Man-Hours, Labor Cost, Material Cost and Total Cost

4 Time and Material Contract Example
Typical Compensation format in Norway

5 Evaluation Compare bidders Analyze norms and rates
FEED MTO Compare bidders Analyze norms and rates Scenarios / Normalizing Identify «tactical priced norms and rates» Compensation Codes Scenarios Bidders Norms and Rates Compare Reports

6 Contract Evaluation (Demo)
Compensation Codes & CBS Scenarios Bidders Compare Bids Norms and Rates Analyzer

7 Measurement Tool for Company’s verification of Contractor’s measurement and management of quantity update estimates that provides a continuous interpretation of Scope of Work into man-hours and cost through to final account. Deviations, cost changes and inconsistencies can be identified and managed at the earliest possible stage. The tool is divided in two main areas: Quantity Update – Estimates in line with Weight Reporting Quantity Measurement – A/IFC and As-built measurement

8 Quantity Update Project Duration 100% Scope Estimate IFC Quantities
As-Built Quantities 100% Scope

9 Quantity Update Demo Estimate (Forecast) Scenarios
Can be activated / deactivated in estimate Archive Estimate and MTO development Scenarios

10 Measurement Approaches
100% As-Built Verification (Heavy workload) Spot Check of As-Built Continuous verification -> Feedback to Contractor

11 Measurement data flow example
Always use contractor’s measurement 100%, incl. errors and missing data. Contractor 100% transmissions, Incl. Errors, disagreements e.a Feedback Agreed measurement adjustments Company Disagreements Own measurement on the few items we definitive disagree on

12 Measurement Simplified Model
Contractor a Contractor’s MTO 1 Quantity Update 2 b Compensation Codes 3 MTO 4 Estimate 5 Client

13 Measurement (Demo) MTO Information Library Reporting

14 What is there to check ? Reimbursable items
(Not be measured) Tag or articles installed by vendors on equipment packages Compensation code Material Take Off (MTO) on document’s Article weight QtyMgmt Void item’s on documents and index Article length Doc MTO Art Clarifications Duplications in articles, documents or MTO (X) Item's that should be included in other articles with a general compensation code Tag or articles that should be measured in other phases (Hook-up) ATS-MC work paid both in measure and invoice


Download ppt "Utgangspunkt for PowerPoint presentasjoner"

Similar presentations


Ads by Google