Case Study: Lebanon Water Works
Presentation 2: Source Water & Intakes 3/23/2010 Case Study: Lebanon Water Works CJ Bailey Drinking Water Technical Assistance Kentucky Division of Water
2
Overview Lebanon WTP Turbidity numbers DBP numbers Lebanon Water Works
Marion County Water District
3
Lebanon Water Works Surface Water Plant Two sources:
Rolling Fork River Fagan Branch Lake Design Capacity: 3,600 gpm/5.2 MGD Operate hrs per day Average production for June 2018 was 2.5 MGD System population of 7,000
4
Lebanon Water Works Sells to Marion County Water District
System population 16,000 For June 2018 Lebanon Water Works: Produced 76 MG Sold 37 MG to Marion Co WD
5
Lebanon Water Works Conventional Plant
Flocculators: 2 train with 3 units each Sedimentation: 4 trains Filtration: 8 mixed media filters Two clearwells on site (0.6 MG storage) Three storage tanks (total storage 2 MG) Chlorine for disinfection
6
Lebanon Water Works Plant operations:
Turbidity focused prior to 2016 Facility participated in Modular DSO Sept and Sept. 2016 TOC/turbidity removal focused after DSO
7
OAS 2016
8
OAS 2017
9
OAS 2018
10
Lebanon TTHM
11
Lebanon HAA
12
MCWD TTHM
13
MCWD HAA
14
Presentation 2: Source Water & Intakes
Thank You! 3/23/2010 CJ Bailey