Download presentation
Presentation is loading. Please wait.
Published byДиана Перелешина Modified over 5 years ago
1
MRG IFS Correction Date: July 2010 Authors: July 2010 Month Year
doc.: IEEE yy/xxxxr0 July 2010 MRG IFS Correction Date: July 2010 Authors: Ivan Pustogarov, IITP RAS John Doe, Some Company
2
Abstract IEEE P802.11aa/D1.00, April 2010, page 39, lines 36-42:
Month Year doc.: IEEE yy/xxxxr0 July 2010 Abstract IEEE P802.11aa/D1.00, April 2010, page 39, lines 36-42: If distance to the AP is different for different stations, Block Ack frames may overlap at the AP Ivan Pustogarov, IITP RAS John Doe, Some Company
3
July 2010 Example Due to air propagation, Block Ack1 and Block Ack2 may overlap at AP Ivan Pustogarov, IITP RAS
4
Proposed correction Change normative text : to:
July 2010 Proposed correction Change normative text : … and shall transmit a BlockAck frame at a delay of (N+1)*SIFS + N*TXTIME(BlockAck) after the BlockAckReq. to: … and shall transmit a BlockAck frame at a delay of (N+1)*(SIFS+aAirPropagationTime) + N*TXTIME(BlockAck) after the BlockAckReq. The goal is to make IEEE aa-capable devices more universal so they can be used both in indoor and outdoor (outdoor long distance and TV bands) Ivan Pustogarov, IITP RAS
5
July 2010 Strawpoll Should the draft .11aa be changed according to the presentation? Yes: No: Abs.: Ivan Pustogarov, IITP RAS
6
Acknowledgements July 2010
The proposal was made in the framework of FP7 project “Flavia”. Ivan Pustogarov, IITP RAS
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.